A Risk Management Incorporation 255766 Information Technology for Logistics A Simulation of Information System Development Faculty of Engineering, Chiang.

Similar presentations


Presentation on theme: "A Risk Management Incorporation 255766 Information Technology for Logistics A Simulation of Information System Development Faculty of Engineering, Chiang."— Presentation transcript:

1 A Risk Management Incorporation 255766 Information Technology for Logistics A Simulation of Information System Development Faculty of Engineering, Chiang Mai University

2 Scenario Your company is developing a new ERP system. The complete development of this system can offer you a strong competitive edge. Your team is assigned to manage/consult/monitor the development of one core module. This system involves a number of stakeholders and bleeding edge technology. The boss allocates a risk management budget of 500,000,000 Kaak to your team.

3 New Information System Module B Module C Module A Project Organization Chart Your Organizatio n Team 1 Team 2 Team 3 IT Vendor Team 1 Team 2 Team 3

4 Information System Development Requirements System Requirement Specification Design Module A Design Module B Design Module C Design Implementation Module A Code Module B Code Module C Code Verification Module & Integration Test Report Acceptance Test Report Maintenance Operation Manual

5 Standard Risk Management Identific ation Analysis Planning Monitori ng Resoluti on Learning

6 Your Task Ensure that your project is completed successfully within allocated budget. Plan for risk mitigation.

7 Instruction You can adopt or adapt risk management processes as you see fit. The simulation includes 5 development phases. At least one risk is expected in each phase.

8 Game Demonstration

9 Risk Management Stage I: Risk Identification Lack of executive involvement Technology constraints Scope creeps Lack of required development skills Unexpected defects User resistance A list of risks, estimated impacts & mitigations will be provided

10 Risk Management Stage II: Risk Analysis Impact Probability 5510152025 448121620 33691215 2246810 112345 12345 Lack of executi ve involve ment Technol ogy constra ints Scope creeps Lack of require d dev. skills Defects User resista nce Do not totally believe in the experts

11 Risk Management Stage III: Risk Planning Select risk mitigation from available solutions. Submit your risk plan & payment to the moderator, phase by phase. Make your wishes! RiskExpected Impact Method A (100% prevention) Method B (50% prevention) Method C (20% prevention) Lack of executive involvements50,000,00010,000,0002,000,0001,000,000 Technology constraints10,000,0005,000,0002,000,0001,000,000 Scope creeps10,000,0005,000,0003,000,0001,000,000 Simulation Phase I: Requirements Lack of executive involvements C Scope creeps C Plan for all development phases but submit only for the forthcoming phase

12 Risk Management Stage IV.I: Simulation - Requirements Risks Encountered!! Lack of executive involvemen t Lack of user involvemen t Unable to finish within deadline Pay for resolution if you did not plan

13 Risk Management Stage IV.II-IV.VI: Simulation - Design- Maintenance Risk

14 Simulation Phase I: Requirements 10 Minutes

15 Simulation Phase II: Design 10 Minutes

16 Simulation Phase III: Implementation 10 Minutes

17 Simulation Phase IV: Verification 10 Minutes

18 Simulation Phase V: Maintenance 10 Minutes

19 Summary