G.Barber KEK Test Beam Update, Berkeley 9 Feb 20051 KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors Patch Panel & Connectors
2
G.Barber KEK Test Beam Update, Berkeley 9 Feb 20052 Station Progress The 4 th station is now under construction. The layout has a total of 30 connectors, 10 per view. Each connector has 22 holes instead of the previous 18 but all of these are not used in every connector. All 3 planes are glued and the ‘connectorisation’ is under way and will be finished by the end of this week. It will then undergo extensive checking before being potted.
3
G.Barber KEK Test Beam Update, Berkeley 9 Feb 20053 Space Frame Components All of the components that make the space frame assemblies have been or are in the process of being manufactured. Tooling The jigs that align the space frames are all manufactured. One further development?
4
G.Barber KEK Test Beam Update, Berkeley 9 Feb 20054 Connector Map 126 Way 128 Way 125 Way View ‘W’ 211 Channels View ‘V’ 211 Channels View ‘X’ 211 Channels
5
G.Barber KEK Test Beam Update, Berkeley 9 Feb 20055 Connector 1 View ‘V’ 18 Way Bundles 2 – 19 To Bulkhead Connector - 1 Station connector Viewed from the polished face 2 6 4 8 5 7 3 91011 12 14 13151617 19 18 x x xx
6
G.Barber KEK Test Beam Update, Berkeley 9 Feb 20056 Bulkhead Connector 1 View ‘V’ 126 Way Bundles 2 – 127 in ‘V’ From Connectors C1 – C6 Station connector Viewed from the polished face 2 6 4 8 5 73 9 1011 12 13 x 14 18 16 20 22 24 15 19 17 21 23 25 26 30 28 32 34 36 27 31 29 33 35 37 39 43 41 45 47 49 38 42 40 44 46 48 50 54 52 56 59 61 63 67 65 69 71 73 74 78 76 80 83 85 87 91 89 93 95 97 98 102 100 104 107 109 111 115 113 117 119 121 51 55 53 57 62 66 64 68 75 79 77 81 99 103 101 105 86 90 88 92 110 114 112 116 122 126 124 123 127 125 70 94 118 58 82 106 72 96 120 60 84 108 x
7
G.Barber KEK Test Beam Update, Berkeley 9 Feb 20057 Prototype Layout All of the components that make the space frame assemblies have been or are in the process of being manufactured. There is still detail design to do to complete the assembly a list of outstanding items is on the next slide
8
G.Barber KEK Test Beam Update, Berkeley 9 Feb 20058 KEK Test Beam – Tracker Progress To do list Final detail for the outer casing including the brackets to fix the assembly during transport and into the magnet. The modification that will allow the original prototype stations to be married to the new space frames A new patch panel to be made or the existing one modified. The space frames to be assembled Polishing of the 4 th station
9
G.Barber KEK Test Beam Update, Berkeley 9 Feb 20059 Conclusions There is still a number of items to design and detail and a few outstanding items to manufacture but overall we are in pretty good shape. In the next month we hope to complete and be ready to ship so that we/I can concentrate on the final tracker design.