Download presentation
Presentation is loading. Please wait.
Published byGertrude Golden Modified over 8 years ago
1
2-3rd. September 2002TPC Collaboration Meeting1 TPC INTEGRATION & SERVICES Mini Space Frame Back Frame Cooling Systems Cables Gas Systems Items Requiring Urgent Attention Participants: S. Evrard/EST D. Gabriele /EST R. Gregory/EST F. Hahn /EP S. Haider /EP S. Maridor/EST Meuller /ST L. Leistam/EST M. Pimenta dos Santos /ST P. Szymanski/EP
2
2-3rd. September 2002TPC Collaboration Meeting2 MINI SPACE FRAME Original concept Access Now more detail
3
2-3rd. September 2002TPC Collaboration Meeting3
4
2-3rd. September 2002TPC Collaboration Meeting4
5
2-3rd. September 2002TPC Collaboration Meeting5
6
2-3rd. September 2002TPC Collaboration Meeting6
7
2-3rd. September 2002TPC Collaboration Meeting7
8
2-3rd. September 2002TPC Collaboration Meeting8
9
2-3rd. September 2002TPC Collaboration Meeting9
10
2-3rd. September 2002TPC Collaboration Meeting10
11
2-3rd. September 2002TPC Collaboration Meeting11 BACK FRAME General Layout Access ROC Installation tool
12
2-3rd. September 2002TPC Collaboration Meeting12
13
2-3rd. September 2002TPC Collaboration Meeting13
14
2-3rd. September 2002TPC Collaboration Meeting14
15
2-3rd. September 2002TPC Collaboration Meeting15
16
2-3rd. September 2002TPC Collaboration Meeting16
17
2-3rd. September 2002TPC Collaboration Meeting17 COOLING Work package & Units Detailed design Installation schedule Cost estimates
18
2-3rd. September 2002TPC Collaboration Meeting18
19
2-3rd. September 2002TPC Collaboration Meeting19
20
2-3rd. September 2002TPC Collaboration Meeting20
21
2-3rd. September 2002TPC Collaboration Meeting21
22
2-3rd. September 2002TPC Collaboration Meeting22
23
2-3rd. September 2002TPC Collaboration Meeting23
24
2-3rd. September 2002TPC Collaboration Meeting24
25
2-3rd. September 2002TPC Collaboration Meeting25
26
2-3rd. September 2002TPC Collaboration Meeting26
27
2-3rd. September 2002TPC Collaboration Meeting27 CABLES Low Voltage High Voltage Control & Read-out
28
2-3rd. September 2002TPC Collaboration Meeting28 CABLES (LV)
29
2-3rd. September 2002TPC Collaboration Meeting29 CABLES (LV) Cont. * 40m length
30
2-3rd. September 2002TPC Collaboration Meeting30
31
2-3rd. September 2002TPC Collaboration Meeting31 CABLES (LV) Cont. Companies recommend Cables outside L3 magnet & Bus Bars inside (economic reasons) Heat dissipation from Bus Bars a worry (cooling will be necessary)
32
2-3rd. September 2002TPC Collaboration Meeting32 TEMPERATURE (0.18) Anna Mueller ST/CV
33
2-3rd. September 2002TPC Collaboration Meeting33 VELOCITY FIELD (0.18) Anna Mueller ST/CV
34
2-3rd. September 2002TPC Collaboration Meeting34 TEMPERATURE (0.24) Anna Mueller ST/CV
35
2-3rd. September 2002TPC Collaboration Meeting35 CABLES (HV) 100kV on both RB24 & RB26 sides HV (FEE ?) both sides Control cables for HV both sides
36
2-3rd. September 2002TPC Collaboration Meeting36 CABLES (control) DDL Cal. Pulser Gating Pulser Temperature sensors Clock/Trigger DCS/Profibus Other?
37
2-3rd. September 2002TPC Collaboration Meeting37 GAS STSTEMS Work packages Limits of supply Construction of units has commenced Testing with dummy load May 2003
38
2-3rd. September 2002TPC Collaboration Meeting38 WORK PACKAGES Mixing,circulation,purifier & CO 2 separation units (GWG) Primary supplies & interconnecting pipework (EST/GDS) Integration (ALICE Team) GOOFI unit (???)
39
2-3rd. September 2002TPC Collaboration Meeting39 LIMITS of SUPPLY Up to a flange on the distribution manifold (front face of the TPC Field Cage) Field cage Manifold Flange Flexible Pipe from GOOFI unit Limit of supply
40
2-3rd. September 2002TPC Collaboration Meeting40 SYSTEM TESTS Starting Spring 2003 –In SGX2 –With 90m3 dummy load Is it required to test TPC before lowering to UX25? –If so where?
41
2-3rd. September 2002TPC Collaboration Meeting41 ITEMS REQUIRING URGENT ATTENTION LV Cable Cooling ROC Insertion Tool
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.