Download presentation
Presentation is loading. Please wait.
Published byLouisa West Modified over 8 years ago
1
News from the lab Large size Micromegas chambers Saclay, 18-19 April 20131 Givi Sekhniaidze / Joerg Wotschack
2
Saclay, 18-19 April 20132 On the 2.8 x 2.8 m² granite table was located thin plastic mesh for pressure distribution Covered with 175 μm thick mylar foil with ø3 mm holes Pump connectors
3
Saclay, 18-19 April 20133 Gas distribution Mesh frame support frames
4
Saclay, 18-19 April 20134
5
5
6
6 Cross-bars Long bars Sucking heads
7
Saclay, 18-19 April 20137 30x50 mm cross-bars – 1.2 m 50x80 mm long bars – 2.5 m Glued with Araldite 2011 4-5 sucking heads per bar
8
Long bars Metrologic Shims Stiff bars Planarity (in microns) 12 rectified bars with 4 or 5 suction cup
9
X 12 Vacuum Clarinet gas PCB Using Skin suction Tool Vacuum Expansive glue Vacuum Precise shim Saclay, 18-19 April 20139 Skin
10
Saclay, 18-19 April 201310 Mesh Cyanoacrylate Araldite 2011 Drift PCB
11
Saclay, 18-19 April 201311 5 mm thick Aluminum frame mounted on the panel Mesh stretched and glued on the frame 3 special inserts for drift/read-out panel interconnection
12
Saclay, 18-19 April 201312 M3 screw O-ring Pillars Insert Mesh
13
Saclay, 18-19 April 201313
14
Saclay, 18-19 April 201314
15
Saclay, 18-19 April 201315 0.5 mm thick FR4 external skin 10 mm thick Aluminum honeycomb External Aluminum frames
16
Saclay, 18-19 April 201316
17
Saclay, 18-19 April 201317
18
Saclay, 18-19 April 201318 Due to the deformation of the stiff-back structure the distance between the PCB and the “half” panel was not correctly defined and problems appeared with the gluing. Along of the external Al frame and in some small areas also in the central parts of the PCB the glue is not attached correctly We found gas leak in the drift panel of L2 chamber. In the new drift panels the gas leak problem has been solved. The drift “old” panel of the L2 chamber will be replaced next week
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.