POSITIONS STRUCTURE 3 teams 2shifts +6 workdays a week Headcount as of May 30 th 2008: President, EVP, PVP 3 GM 5 DGM 6 MNG 12 DM 12 Coordinator 26 SP.

Similar presentations


Presentation on theme: "POSITIONS STRUCTURE 3 teams 2shifts +6 workdays a week Headcount as of May 30 th 2008: President, EVP, PVP 3 GM 5 DGM 6 MNG 12 DM 12 Coordinator 26 SP."— Presentation transcript:

1 POSITIONS STRUCTURE 3 teams 2shifts +6 workdays a week Headcount as of May 30 th 2008: President, EVP, PVP 3 GM 5 DGM 6 MNG 12 DM 12 Coordinator 26 SP 173 AS 39 SV 26 GL 124 TL 450 TM 2 527

2 1.000.000 th car : November 2008 PRODUCTION 2005 103,819 cars Second shift (4 weekdays and nights) First shift (4 weekdays) Third shift (Saturdays and Sundays) 2.10.27.6. 2006 28.2. 435 cars/day 910 cars/day 1050 cars/day 2007 308,000 cars 2008 320,000 cars 2006 293,650 cars 1150 cars/day

3 QUALITY True measure of quality is the satisfaction of our customers! Production peak achieved earlier than planned High quality standards have been kept ! Quality assurance in TPCA:  Raw material inspection  Build-in Quality  Quality control testing throughout the production system  Quality control testing after the final assembly line  Test track  Shipping Quality Audit testing

4 Quality: What makes us succesfull? Jidoka principle Defects and mistakes = worst method of wasting Each member is a quality inspector In case of any problem: Member stops the process… …and solves the problem. QUALITY Any lack of quality is discovered and solved immediately and cannot be passed on to the following proces

5 TPCA – LEADING CZECH COMPANY

6 WHY THE CZECH REPUBLIC? Strategic location in the centre of Europe Short distance to key markets Advanced suppliers network Connection to main traffic routes Industrial tradition Government policies support investments

7 IMPROVEMENTS OF INFRASTRUCTURE All commitments of Czech Republic and Kolin have been realized: Industrial zone preparation Factory railway connection Transport infrastructure (connection to D11 motorway) Finalization of D11 motorway Construction of 850 municipal flats

8 55% 29% 8% 5% 1% 2% 80 % of the volume of parts from the CR 80 % of the volume of parts from the CR USING LOCAL SUPPLIERS TPCA transports 60% of completed cars by railway.

9 Company values:  Respect for People  Teamwork  Continuous improvement (Kaizen) Workplace:  Focus on maximum work safety and health of employees Employees’ care:  Housing support (cooperation with developers)  Infrastructure development (e.g. children´s nursery) HR development:  Training and improving qualification  Stable employment Salary conditions:  Top 25% of the best Czech companies in terms of salary (7.5% growth in all tariff employee categories in 2007)  Introduction of new attractive benefits (car leasing, housing) BEING GOOD EMPLOYER TPCA’s ultimate goal: Be the best employer in light-industry! TPCA’s ultimate goal: Be the best employer in light-industry!

10 Protection of the environment = A top priority of the company COMMITMENT TO THE ENVIRONMENT Compliance with legal and other requirements Continual improvement – KAIZEN Prevention of emissions Using energy and water efficiently Reducing and recycling wastes TPCA´s certifications:  2005: Best available techniques (BAT) certification  2005: International standard ISO 14001 certification

11 CORPORATE CITIZENSHIP Minimal impact on the environment Creating business and job opportunities for locals Dialogue with citizens and local authorities Cooperation with schools O „Partnership for Kolin“ grant program (4 M each year for cycling paths and playgrounds; building, educational and social projects)


Download ppt "POSITIONS STRUCTURE 3 teams 2shifts +6 workdays a week Headcount as of May 30 th 2008: President, EVP, PVP 3 GM 5 DGM 6 MNG 12 DM 12 Coordinator 26 SP."