Felix Sanchez Estimating the Budget and Cost (Part 1) Project Management for ARA Engineers and Scientists Developing a Bottoms Up Estimate.

Similar presentations


Presentation on theme: "Felix Sanchez Estimating the Budget and Cost (Part 1) Project Management for ARA Engineers and Scientists Developing a Bottoms Up Estimate."— Presentation transcript:

1 Felix Sanchez Estimating the Budget and Cost (Part 1) Project Management for ARA Engineers and Scientists Developing a Bottoms Up Estimate

2 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 2 Desired Learning Objectives  Be able to develop a “bottoms up” cost estimate and budget for a project  Recognize that a Responsibility Assignment Matrix identifies who is responsible for work and budgets for each WBS  Be able to represent what it will cost to do the work and who will do the work with a Resource Loaded Network (RLN) in order to estimate costs  Identify challenges in staffing a project at ARA  Know all the elements required to make up an ARA project budget

3 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 3 Designing the Program Structure  Define the Scope SOW Review Design the WBS – driven by SOW  Design the Team Organization Driven by WBS Driven by customer (IPT, contract requirements, etc.) Driven by size of project or cost  Design the Plan and Schedule Integrated Master Plan Integrated Master Schedule  Identify the staff and allocate the resources (Resource Loaded Network)  Do a pre-cost proposal – ROM – within customer’s bogey Planning and Scheduling and Pre-Cost Proposal Estimate

4 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 4 Five Elements for Program Management 1.Organization: Define contractual effort and assign responsibility for work. 2.Planning and Budgeting : Plan, schedule, budget and authorize work. 3.Cost Reporting: Accumulate cost of work and material. 4.Analysis: Compare planned and actual costs to performance and analyze variances. Develop estimates of final cost. 5.Close Out: Ensure within cost and schedule and market follow-on efforts. Work Breakdown Structure (WBS) Program Organization Task Definition Schedules Budget (Resource Loaded Network) Cost Reporting Performance Measurement Variance Analysis Reports (VAR) Estimate at Completion (EAC) Close Out Performance Measurement Close Out

5 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 5 Resource Allocation  Schedules usually drive the cost An integrated master schedule provides the foundation for developing the cost plan Need to reconcile with customer’s funding profile  WBS is used to segregate budgets and identify costs based on who is performing the tasks  Who is assigned to work tasks provides the first cut for the cost of staff based on the WBS Schedule

6 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 6 Who’s Responsible for Work and Budgets for Each WBS? Results in a Responsibility Assignment Matrix

7 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 7 Who’s Responsible for Work and Budgets for Each WBS?  RAM: a communication device providing a summary level picture of Where work and budgets are assigned From which cost build up is developed Identifies the tasks or products to an organization (or other Division) by WBS elements All WBS’s identified are assigned to an individual (Task Leader or Control Account Manager) who is responsible for managing the completion of that task  Budget at Completion (BAC) is associated with the reporting account level and is reflected at the intersection of WBS and Task Leader or CAM (as shown on previous slide) Responsibility Assignment Matrix (RAM) $ Task 1 hrs

8 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 8 What Will the Work Cost? Who Will do It?  RLN = IMS + (Who and # of Hours +ODCs) for each task  For each task Who is going to do that work? determines staffing How many hours by each staff member/rate?labor cost What materials and procurements needed?ODCs What travel needed? ODCs What subs needed?ODCs plus M&S fee Details of understanding cost elements, loading and escalation of rates in Part 2 Create a Resource Loaded Network (RLN) Summation of each Task equals ROM program cost

9 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 9 Sample RLN in MS Project

10 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 10 Sample RLN Template in Excel Note: Sample electronic Excel template in handouts

11 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 11 S/W Development Project: RLN = IMS + Who + # Hours (or $)

12 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 12 S/W Project Sample RLN (cont.)

13 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 13 Challenges in Staffing  What expertise is available in your Division?  What SME available in other Divisions?  Do they have the time to dedicate to your project?  What happens when they get pulled for higher priority projects?  How do you manage remotely to staff in other Divisions?

14 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 14 Typical Staffing Challenges CC24253287.ppt Headcount Analysis Months Staffing Planned Actual JulSepNov 10 8 6 4 2 0 AugOctDec

15 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 15 Other Elements of An ARA Budget  What expertise is not available in your Division?  Include all loading factors (more detail in part 2): Labor – load with overhead (x%), G&A (y%) and profit (7.5-20%) ODCs – load with G&A and profit Materials and Subcontracts – load with G&A (x%) and profit Travel – load with G&A and profit (if acceptable to client)  Include management reserve Equal to approximately 10+ percent of the value of the project Be careful on T&M and CPFF projects to spend the management reserve prior to completing the project  Include budget for technical computer usage

16 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 16 Summary  A “bottoms up” cost estimate for a project is most accurate and provides most insight in your planning  Resources Loaded network (RLN) = IMS + (Who and # of Hours (or $) + ODCs) for each task  Must account for all the elements required to make up an ARA project budget Or else it comes out of your management reserve Or worse, your profit! Budget


Download ppt "Felix Sanchez Estimating the Budget and Cost (Part 1) Project Management for ARA Engineers and Scientists Developing a Bottoms Up Estimate."