EMS User’s Group Presented By Margaret Goodrich Project Consultants, LLC Presented to EMS User’s Group Austin, TX September.

Similar presentations


Presentation on theme: "EMS User’s Group Presented By Margaret Goodrich Project Consultants, LLC Presented to EMS User’s Group Austin, TX September."— Presentation transcript:

1 EMS User’s Group Presented By Margaret Goodrich Project Consultants, LLC margaretgoodrich@earthlink.net Presented to EMS User’s Group Austin, TX September 25, 2007 CIM Extended to Power System Planning at ERCOT

2 2 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX Topics ERCOT Requirement ERCOT CIM Extensions –New Packages –New Classes –New Attributes Topology Processor Customization EPRI CIM for Planning Project –Objectives –Key Steps –Use Cases –Additional Extensions

3 3 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX ERCOT Requirements and Needs ERCOT has been mandated by Nodal Protocols to use CIM standards for model exchange and posting Annual Planning Models are required by protocols to be posted in CIM/XML format ERCOT needs an agreed upon framework to: –Map a planning model to the CIM –Provide incremental Planning files in CIM/XML –Convert a solved model in Network Operations to a solved model in planning Improve consistency between the Planning model and the Operations model. Obtain naming consistency between Operations and Planning models

4 4 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX ERCOT CIM Extensions The Network Modeling Group has extended the CIM for all ERCOT needs including EMS and/or Planning For Planning, we have identified: –In-Service/Out-of-Services Flags –Ownership & Operatorship –Ratings (Static & Dynamic) –Latitude & Longitude –Location/County –Bus Number

5 5 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX ERCOT CIM Extensions In-Service/Out-of-Services Flags - an Attribute of a PSR (Boolean) Ownership - This contains one or more names of the owners and the percentage of ownership. Every Device in the model will inherit from this. Operatorship - This contains one or more names of the operators and companies that operate the Transmission Element.

6 6 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX ERCOT CIM Extensions Ratings (Static & Dynamic) - This class needs to model both Static and Dynamic ratings (or we can add an additional class for Dynamic ratings). There must be three types of Ratings: Normal, 2 Hour, and Emergency (15 minutes for operations and conductor for planning). Latitude & Longitude - is a decimal number that is an attribute of a Substation

7 7 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX ERCOT CIM Extensions Location/County – is a string that is an attribute of a Substation Bus Number – is an integer that is an attribute of a Topological Node

8 8 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX CIM Extension - New Packages New Packages include: –ETXContingency –ETX –ETXLoadModel –ETXMonitoring –ETXNetwork –ETXPlanning –ETXRASE –ETXRating –ETXRegulation –ETXSCADA

9 9 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX New Classes Some of the classes include: –BranchGroup –MonitoredGroup –ConnectivityNodeGroup –PlanningArea –PlanningZone –ProtectiveAction –RemedialActionScheme

10 10 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX New Attributes Some of the attributes include: –minimumEnergencyMW –MWMax –PSSEBusNumber –maximumActivePower –minimumReactivePower –isRAS –isRAP –Generationloss –Loadloss

11 11 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX Updated Topology Processor ERCOT has procured a new Topology Processor that provides options to handle the differences between the operations and planning model: –Option to Collapse the three 2-winding transformers that represent a three winding transformer to one 3-winding –Option to convert Distributed Generators to Negative Loads –Option to select a containment schema - Zone or Area population has a containment of Load, Owner and Weather –Option to provide an updated contingency list based on topology processed file – Option to specify a temperature to be used as the basis for the rating of dynamically rated lines

12 12 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX EPRI CIM Planning Project Objectives Develop a common model that both operations and planning groups can use as a basis for information exchange Provide the possibility of entering network model data once for both planning and operations applications To build transparency between the operation models and planning models, thus allowing both sides to share critical common information (e.g. ratings, impedance etc). This effort will also evaluate the CIM readiness from two vendors (one for EMS and one for Planning). To evaluate the adequacy of CIM database as a single data source for a power system model repository for PLANNING.

13 13 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX EPRI CIM for Planning Project - Key Steps 1.Define and analyze use cases to identify priority business processes and requirements that need to be supported in the CIM and when exchanging models –Identify processing requirements for transformation/translation –Identify data exchange requirements that need to be supported in the CIM 2.Identify and resolve differences between operational and planning models. 3.Identify and document planning extensions for the CIM –Develop extensions to UML diagrams – add to existing and/or create new class diagrams for planning models –Define new planning profile(s) sufficient to support model types. 4.CIM Mapping Spreadsheets –Develop agreements to map proprietary data representations to CIM- based representations

14 14 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX EPRI CIM for Planning Project - Key Steps (cont’d) 5.Define the XML/RDF schemas needed to support the priority information exchange requirements between planning and operations 6.Conduct interoperability tests to prove the feasibility of model resolutions, CIM extensions, planning profiles defined, and XML/RDF schema definitions. 7.Prepare technical report to document recommendations and issues 8.Conduct industry workshops 9.Submit documents produced to the appropriate standards committees to incorporate the planning extensions into the CIM and related standards.

15 15 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX Mapping Spreadsheets Generic Data Requirement CIM Class and PropertyCIM Extension Area IdentifierInterchangeArea.mRIDYes Area NameInterchangeArea.nameYes Swing Bus IdentifierTopologicalNode.type=area swing bus Yes Scheduled Net InterchangeInterchangeArea.pNetChangeYes Interchange ToleranceInterchangeArea.pToleranceYes Area DescriptionInterchangeArea.aliasName or InterchangeArea.description Yes

16 16 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX EPRI CIM for Planning - Use Cases Operation to Planning -- Allow planning to import CIM compliant power flow model from EMS. Planning then can compare critical common information used in both Operation and planning models. Planning to Operation -- Allow planning to send new equipment parameters in CIM format back to EMS. Planning to Planning -- Be able to generate base cases efficiently, consistently and reliably and exchange these with other planning applications.

17 17 © 2007 Project Consultants, LLC All rights reserved. EMS User’s Group – September 25,2007 – Austin, TX More Information Email: margaretgoodrich@earthlink.netmargaretgoodrich@earthlink.net Cell: (903) 477-7176 CIM User’s Group Web Site: http://sharepoint.ucausergroup.org/CIM/ http://sharepoint.ucausergroup.org/CIM/