Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 GSFC NRA Proposal Template 15 March 2006 Requirements, Considerations, Mechanics Brenda Hanrahan / SED.

Similar presentations


Presentation on theme: "1 GSFC NRA Proposal Template 15 March 2006 Requirements, Considerations, Mechanics Brenda Hanrahan / SED."— Presentation transcript:

1 1 GSFC NRA Proposal Template 15 March 2006 Requirements, Considerations, Mechanics Brenda Hanrahan / SED

2 2 NRA Proposal Template Requirements –Full Cost Mechanics –Scientist Feedback Eliminate data entry on separate sheets for each fiscal year –Staffing and cost profiles by Fiscal Year –Organized to enter Key and Other personnel –NSPIRES, Ease of Entry Data in template in the same order as required for NSPIRES data entry An Input Form that Matches NSPIRES Entry Screen Ability to over-ride GSFC civil servant salary to enter “actual” (inflation based on full cost rates) External Customer Agreement Form (AETD) Traveler (NOO-New Opportunities Office)

3 3 NRA Proposal Template Considerations –Operating Account – Varied Algorithms (600) Separately identify org codes to each cost line to advocate “shared” support across organizations (500/600); preclude taxing other org support –Data fields that better enable metrics –External Customer Agreement Form –List of Announcements, Due Dates –Route Sheet –Changes to NSPIRES Data Entry From 3 screens per fiscal year to 7 screen –Cost Sharing

4 4 NRA Proposal Template Mechanics / Features –Menu Template Issue and Full Cost Guidance Dates for version control Buttons for sheet navigation and process visualization Organization Information –GSFC Proposal Initiator Information –SED Tax Structure / Methodology Proposal Information – “Feeds” Customer Agreement Form –Drop Downs from existing tables for selection of Types of: »Customer Relationship (N=3) »Proposal Opportunity (N=4)

5 5 NRA Proposal Template Template Mechanics / Features - Menu Drop Downs for Selection of Types of: –Program Elements (from NSPIRES Solicitations Listing/s); ‘automatically’ fills in Announcement Number/Title and proposal due date (fields available to enter non-listed Program Elements and Due Dates (cells grayed-out if selection is made from list; conditional formatting) –Proposer enters: »Proposal Start and End Dates - determines number of visible Fiscal Years »Proposal Title and Brief Description of Activity »Names and Organizations of PIs, Co-I’s, and Other Support (feeds into subsequent Workforce and Cost sheets)

6 6 NRA Proposal Template Template Mechanics / Features –Workforce Key personnel are assumed to be PI and Co-Is; other personnel are assumed to be “support” –PI/Co-I, Names and Organizations are fed into subsequent fields from Menu Proposer can enter Cost Targets and monitor against proposed costs; select from drop down lists –Skill category (GSFC Full Cost skill list) –Labor category (N=5) : Civil Servant, University Scientist On-Site, Contractor On-Site, Contractor Off-Site, Pass-Thru/Off-Site Proposer enters FTEs - converted to calendar months for NSPIRES entry GSFC Full Cost workforce “loads” are calculated

7 7 NRA Proposal Template Template Mechanics / Features –Cost Option to enter actual civil servant salary; otherwise, GSFC Full Cost rate is applied for the selected skill (inflation performed consistent with the inflation in GSFC Full Cost salary rates) Proposer enters other Key Personnel salary and, if known, Fringe (otherwise, include “loaded” Salary, Fringe [and G&A] in Salary –Salary and Fringe fields are shaded (conditional formatting) as appropriate to Labor Category selection (ie, civil servant vs non) Proposer can see total calculated costs, including taxes (suggestion to modify template to show CS Fringe) Proposer can monitor to Targeted costs on this screen also

8 8 NRA Proposal Template Template Mechanics / Features –Cost (Cont’d) Enter non-Labor requirements for –Equipment, Travel, Participants –Materials, Pubs, Consultant, ADP/Computer –Subawards / Consortium / Other Contractual (not to include costs already reported under Salaries and Wages for Key and Other Personnel; also, more lines will be added for additional Co-Is) –Equipment or Facility Rental / User Fees; Alterations and Renovations Enter required hours of support - GSFC Full Cost FTE/WYE ‘Loads’ are ‘automatically’ calculated –Fabrication, Test Services, Safety & Mission Assurance –Mission Success (as directed by Code 170) Enter any other costs (Pass-Thru G&A field will be eliminated - - use Subawards category instead)

9 9 NRA Proposal Template Template Mechanics / Features –NSPIRES Input (template needs to consolidate some ODC lines) –NSPIRES Summary If the NSPIRES Total Budget screen does not match the total costs by category on this sheet, make correction to NSPIRES –Customer Agreement Sheet (format needs consensus) –GSFC Traveler (format needs consensus) –Route Sheet Outstanding Issue/s –Cost Share Sheet (CS) –Button (macro) to “Print Final Routing Package” that will print Route Sheet and other Reports (content depends on directorate needs / consensus) –Searchable PDF for NSPIRES; electronic transmission to outside PIs (without formulas, links, tables, other [hidden] sheets) Mac vs PC capability

10 10 NRA Proposal Template Roll-Out Plan (and many thanks to … –NRA Template Working Group Diane Elben (Metrics), Donna Drummond (AETD), Justin Robinson and Anthony Loggia (VBA/Design Assistance), Jim Green, SED Cost Proposal Manager –Proposal Metrics Working Group (Diane Elben, Jill Kirby, Dick Schneider, Justin Robinson. Jim Green) –SED Business Management Officers –NOO Grassroots Cost Working Group (Lauri Via, Robyn O’Mara) –GSFC Community (March 15) Where is it? When will it be there?


Download ppt "1 GSFC NRA Proposal Template 15 March 2006 Requirements, Considerations, Mechanics Brenda Hanrahan / SED."

Similar presentations


Ads by Google