Greenlee County June 2008 County Engineers – Mormon Lake Philip Ronnerud, Engineer
2
Greenlee County Created 3/10/1909 2000 Population 8,547 2006 Estimate 8,394 1,838 sq mi 6% private land
3
Greenlee County free flowing streams
5
Roads 1 st Chip seal FY 08 June 2008 350 miles of roads 35 miles paved 315 miles unpaved Need easement inventory 26 Bridges
6
Major Projects New Maintenance Facility Centrally located at airport (Three Way) Developing facility program 15 acre site with outside storage Offices and Shops
7
ADOT Gila River Bridge US 191 – Guthrie - $28 million AMEC – Designer / FNF Contractor
8
Local Bridges Rehabilitation of 4 wood bridges 2 concrete arch bridges
9
Airport Extend West Taxiway bid at $1 million $1 million Apron rehabilitation – 100% Signage – 100% Airport Master Plan Update Drainage Master Plan Drainage improvements DBE/GPS Security Fence EA Runway/Taxiway Obstruction removal
10
Planning 550 homes - Freeport-McMoRan 125 homes planned in Clifton 140 homes planned in unincorporated area of County Tripled permitting in 2007 and DES says population is decreasing Small Area Transportation Plan Amendment 1
11
Landfills MSWLF and C&D Enlarge MSWLF permitted cell, and Design 25 acre MSWLF expansion 2 transfer stations Relocated waste tire site Enlarge C&D Landfill cell
12
Stateline Road Bank stabilization Revised Ordinance DFIRM’s effective September 28, 2007 Levy like structures Provisionally Accredited Levee (Clifton 1 st PAL in nation) Clifton flood warning system Enacted Flood District Tax – FY 2007 AWPF Grant to restore 1 mile of the Gila River Floodplains
13
Questions? Thanks for your attention. Philip Ronnerud (928) 865 4762 pronnerud@co.greenlee.co.az