Download presentation
Presentation is loading. Please wait.
Published byWesley Pitts Modified over 8 years ago
1
National Capital Region Interoperability Program National Capital Region Interoperability Program (NCRIP) RPWG/ESF Chair Quarterly Report October 31, 2005
2
2 NCR Data Interoperability Communications Architecture LEGEND Existing Fiber Connected I-Net Site or Hub Candidate I-Net Site Existing I-Net Fiber Candidate I-Net Fiber Broadband Wireless Phase1 Information Broadband Wireless Phase2 Broadband Wireless Future Phases Field Mobile Operations Data& Applications Offices EOCs Government Centers Operational Centers “Tracks” “ T r a c k s ” “ T r a c k s ” “Users” “Trains” “Users” Core Elements Shared Services Standards Governance Outreach
3
3 RWBN Program Status and Plan FCC STA Approval 2/1/07 Region 20 Approval 12/20/06 STA Package Submittal to R20 12/11/06 Temporary Licenses NCR Licensing 9/27/07 FCC Approval 8/14/07 Neighbor Approval (DE, PA, WV, VA (Non Northern VA) 11/10/06 Regional Plan – Regional Approval 8/14/06 Broadband compatible plan (First Draft) 5/1/06 Regional Plan and Permanent License Approved Waiver Notice + 105 days) 1/8/07 Reply Comments Notice + 45 day 11/6/06 Public Notice of Waiver (Escalated. To Congress) 9/22/06 Submission to FCC Initial: 5/12/06 Revised: 7/3/06 Regional Approval (Arlington / Alexandria approval – (4/7 – Most) (6/15 – A&A) Waiver Spectrum / Licensing Site Acquisition DC – Complete Alex – Started Arl – started Requirements consensus (incl. assessments) 3/1/06 Network Acceptance 3/30/07 Equipment Delivery and Installation 3/1/07 Site Construction Start: 2/1/07 Deployment Approval (Needed prior to construction and contract award by Start: 12/1/06 Permitting / Zoning Start: 12/6/06 Phase 1 Deployment (District, Arlington, and Alexandria) Contract Award 12/20/06 Proposals Due 10/11/06 Q&A 8/22/06 RFP Advertisement 8/7/06 Regional RFP Approval 7/1/06 Scope / Contract Legend
4
4 Near Term DEH Logical Architecture Various critical operational standards developed and adopted Phase I exchanges directed to EOC for all ESF benefit WebEOC and HSIN exchanges in Phase I Regional GIS via portal exchanges (MEGIN) in Phase I
5
5 INET - FY2005 Plan DC to MC fiber interconnect complete Operational pilot use of link and MOU in progress Fairfax/Arlington/Alex link by 1/1/06 MAX network finalized to extend link from DC- Fairfax-PG Microwave links on schedule
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.