Download presentation
Presentation is loading. Please wait.
Published byMorgan Pearson Modified over 8 years ago
1
LULA GREEN ROAD UNION, SOUTH CAROLINA Jerry A. Brannon, Sr.,PE Union County Engineer
4
Project Description Project Length – 2.8 Miles Dirt and stone – 2.5 Miles Asphalt - 0.3 Miles Ditches & shoulders - 5.6 Miles Crossline Pipe - 76 Feet 18 “ Rip Rap - As Needed Macadam Stone - 2.5 Miles Bituminous Surface - 2.5 Miles
5
Project Description Re-grade 5.6 Miles of shoulders and ditches Re-grade and reshape 2.3 miles of road bed Spread, shape and compact macadam stone Clean existing pipe Place new cross line pipes Install erosion control
6
Project Description Phase II – Install 18’ bituminous surface treatment Total Project cost estimated at $125,000 Addition funds anticipated from CTC and Union County Forces providing most of labor
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.