Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Release Grade – סיפורו של מדד Riki Tzadok – May 2008.

Similar presentations


Presentation on theme: "1 Release Grade – סיפורו של מדד Riki Tzadok – May 2008."— Presentation transcript:

1 1 Release Grade – סיפורו של מדד Riki Tzadok – May 2008

2 How do we know the Quality of our products? A Solution is found It is not top secret Life is not easy… Making it a working tool! It works! The End? Summary

3 3 Chapter A – How do we know the quality of our Products? Management Requirements: Tool to measure the quality of software deliverables Based on data and not on ‘gut feeling’ Use existing tools/methods Easy to use and understand

4 4 Chapter B – A solution is found i Based on ‘non closed’ defects (no 0 defects upon delivery….) Reflects the customer’s point of view Normalized between -  to 100 Uses existing tools Release Grade – score for SW deliverables

5 5 Release Grade Calculation Basics Each defect is given a weight based on its Severity and Impact (customer point of view) Defect weight = Severity weight * Impact weight All defect weights are summed – ‘R-Sum’ The sum is normalized versus a reference project (‘I- Sum’), to give a grade between -  to 100 Release Grade =

6 6 Weights of Impact & Severity

7 7 Chapter C – It is not top secret!

8 8 Measurements Portal (2)

9 9 Chapter D – Life is not easy… People don’t like to be measured What’s in it for me?? Defects database should be validated The relevant tools are not implemented in all R&D organizations Different scales are needed according to product maturity & complexity

10 10 Chapter E – Making it a working tool! The challenge: identify the most relevant user (Release managers) and find out how the metric can help them. if you can’t beat them – join them “if you can’t beat them – join them” – we asked one of the release managers to join the team and we learned better her needs and concerns …and then the tool team gave us just the right solution:

11 11 Measurements Portal (3)

12 12 Measurements Portal (4)

13 13 Measurements Portal (5)

14 14 Chapter F – In works!

15 15 The End? Extend usage to post release Use the release grade as a tool to evaluate sub- contractors deliveries Reflect testing progress vs. release grade Build metrics for development phase as well “The race for quality has no finish line” “The race for Quality has no finish line…”

16 16 Release Grade helps us define measurable targets for release quality and can be used as an additional exit criterion. Release Grade serves both for monitoring and as a working tool (helps in decision making). Summary Release Grade is now implement in about 50% of R&D resulting in a major decrease in deferred defects backlog, which means improved product quality and better customer satisfaction.

17 17 Thanks…. To Tzachi Sadi – the initiator The Implementation team: Shouky Dan, Miki Arad, Nadav Alon, Michal Mahlab All VAS–SQM for their support, ideas, and objections

18 18 ריקי צדוק קומברס, הברזל 29 תל-אביב 69710 03-6452582 טל:,riki.tzadok@comverse.comriki.tzadok@comverse.com


Download ppt "1 Release Grade – סיפורו של מדד Riki Tzadok – May 2008."

Similar presentations


Ads by Google