Mid-Term Meeting R. Aleksan CIEMAT, June 12 th. 2012 TIARA-mTM 1.Meeting Objectives 2.General Information 3.Deliverables/milestones 4.Mid-Term meeting.

Similar presentations


Presentation on theme: "Mid-Term Meeting R. Aleksan CIEMAT, June 12 th. 2012 TIARA-mTM 1.Meeting Objectives 2.General Information 3.Deliverables/milestones 4.Mid-Term meeting."— Presentation transcript:

1 Mid-Term Meeting R. Aleksan CIEMAT, June 12 th. 2012 TIARA-mTM 1.Meeting Objectives 2.General Information 3.Deliverables/milestones 4.Mid-Term meeting 5.Conclusion http://www.eu-tiara.eu http://www.eu-tiara.eu TIARA website: http://www.eu-tiara.euhttp://www.eu-tiara.eu Welcome to mid-Term Meeting 61 registered participants as of today 61 registered participants as of today

2 Thanks Heartily thanks to Prof. Cayetano López Director General and Jose M. Perez Director of Technology Prof. Ramon Gavela Deputy Director General and for hosting TIARA

3 General context Europe is going through an unprecedented crisis since the last World War This crisis will be long and is calling for a new political, economical and financial model There will be (is) opposite temptations /dangers National withdrawal vs European Solidarity “Communautarisme” vs Multiculturalism Science for Europe and Europe for Science We have to work together to show that our Society needs As we did in the past, scientists (we) have to play a leading role in paving the way toward a peaceful and collaborative society

4 Potential of Accelerators is huge The development of state of the art accelerators is essential for many many fields of science (fundamental, applied or industrial)  Particle Physics, Nuclear Physics, Research fields using light source, Research fields using spallation neutron sources, Study of material for fusion, Study of transmutation… Particle Physics, Nuclear Physics, Research fields using light source, Research fields using spallation neutron sources, Study of material for fusion, Study of transmutation… Research accelerators In past 50 years, about 1/3 of Physics Nobel Prizes are rewarding work based on or carried out with accelerators Clinical accelerators Industrial accelerators  radiotherapy, electron therapy, radiotherapy, electron therapy, hadron (proton/ion)therapy… This « market » represents ~15 000 M€ for the next 15 years, i.e. ~1 000M€/year  ion implanters, electron beam and X-ray irradiators, radioisotope production… ion implanters, electron beam and X-ray irradiators, radioisotope production… This market represents ~3 000M€/year and is increasing at a rate of ~10% /year

5 Use of accelerators Application Total systems (2007) approx. System sold/yr Sales/yr ($M) System price ($M) Cancer Therapy910050018002.0 - 5.0 Ion Implantation950050014001.5 - 2.5 Electron cutting and welding45001001500.5 - 2.5 Electron beam and X-ray irradiators2000751300.2 - 8.0 Radioisotope production (incl. PET)55050701.0 - 30 Non-destructive testing (incl. security)650100700.3 - 2.0 Ion beam analysis (incl. AMS)20025300.4 - 1.5 Neutron generators (incl. sealed tubes)100050300.1 - 3.0 Total2750014003680 projectsScience fieldBeam typeEstimated cost LHCParticle Physicsproton3700M€ FAIRNuclear PhysicsProton /ion1200M€ XFELmulti fields electron  photon 1050M€ ESSmulti fields Proton  neutron 1450M$ IFMIFFusion Deuton  neutron 1000M€ MYRRHATransmutation Proton  neutron 700M€

6 TIARA Objectives The Big Issues to be integrated within TIARA Coordinated wide scope sustainable programme Collaborative R&D projects Access to broad variety of large infrastructures Enhanced Partnership and Technology Transfer to Industry for boosting innovation Strong Education &Training in Accelerator Science and Technology

7 Mid-TERM meeting Objectives  Provide general information on TIARA  Review the work done so far  deliverables/milestones, highlights, difficulties  Prepare for second half of TIARA-PP (ending dec. 2013)  Exchange our views on how to strengthen accelerator R&D Main objectives Note also  mTM (with next biannual report) is acknowledged by the EC as being part of the mid-term review Note : TIARA-PP is timely with the European Strategy for Particles Physics

8 TIARA general information  ESRF (visited on February 14 th )  ESS (see P. Carlson talk on Thursday)  ITER/F4E (discussion with R. Heidinger on April 18 th )  NuPPECC (TIARA presentation at NuPPECC meeting on June 16 th )  ECFA (TIARA presentation at RECFA meeting on October 6 th ) Strong Interest for TIARA from many communities  Change in the EC unit for Infrastructures  Visited new unit leader (A. Antelo) on February 28 th  TIARA poster represented at ICRI 2012TIARA posterICRI Further information relative to TIARA

9 TIARA general information  On-going discussion for a joint TIARA-HlLumi workshop with industry (cf. A. Unnervik)  CD&O initiatives (Logo, newsletter, brochure, website… see C. Tanguy)  Biannual report (June 2012) will be used as mid-term report TIARA general activities Other information  EuCARD2 project approved (but negotiation delayed)  Accelerator R&D is a full topic for PP Strategy   2 hour session at Krakow symposium

10 TIARA general information Duration: 3 years A. Unnervik P. Pierini P. Burrows R. A. Y. PapaphilippouK. LongM. Biagini S. Bousson R. A. F. Kircher C. Tanguy

11 First period Deliverables 12 deliverables are available out of 13 due end May + 4 almost ready, to be delivered end June

12 First period Deliverables NumNat[1]Short name Descriptionmonth D1.1OOWSFOverall Web Site Frame ready1PU D1.2OCAPConsortium Agreement between participants ready1CO D1.3OCCEContract of the Consortium with the EC signed1CO D1.4OOKMOrganization of the Kickoff meeting1CO D1.5OIWSFInternal Web Site Frame Ready2CO D4.1RKIRGeneral Report on Key Accelerator Research Areas and Key R&D Issues 5PU D6.1RD_SLS_ NOW Report on existing hardware limitations and needed upgrades. 9PU D5.1RETREducation and Training Survey Report10PU D2.1OMoA-GIMemorandum of Agreement on General Issues12 CO D3.1RISRInfrastructure Survey Report.12PU D5.2OETDEducation and Training resources Database14PU D7.1RRFSysV- Spec Report on the design and specification of ICTF RF power distribution system for MICE Step V 15PU D3.2OIWDInfrastructure Web-based Database.16PU D1.6RTTRMidterm Report18CO D2.3RCOBReport on Collaboration with Other Bodies18 CO D6.2RD_SPECSpecifications ready18PU On-going (in good shape )

13 First period Milestones 15 milestones are achieved out of 18 due end May + 1 not needed, 1 almost ready, 1 delayednot

14 First period Milestones (cont’d) NumNum Annex1 NatShort nameDescriptionmonthDiss. level M3.1MS8ONWPCNomination of WPC for each ARA.1 CO M4.1MS13OFSGFormation of Study Group for Identification of Key Issues1CO M1.1MS1OMTRMonitoring tool and documentation repository4 CO M4.2MS14OFWGFormation of Working Groups5CO M6.1MS25RM_INSTRInterim report on existing beam instrumentation5PU M2.1MS4RI-GIInterim Report on General Issues6CO M5.1MS19OMETRMeeting to plan ETR report7CO M3.2MS9RISRInterim Infrastructure Survey Report8CO M7.1MS27RRFSysReqReport on RF system layout and requirements8PU M8.1MS29OHARDW-APurchase of crucial hardware components9PU M5.2MS20OMETDMeeting to plan ETD database11CO M2.3MS6RI-CDOInterim Report on Communication, Dissemination and Outreach 12 CO M9.1MS33RDSIFDefinition and Specifications of the Irradiation test Facilities12PU Not needed postponed

15 First period Milestones (cont’d) NumNum Annex1 NatShort nameDescriptionmonthDiss. level M9.3MS35RURCSUser Requirements and setting up of the test Cryostat Specifications 13CO M6.2MS26RM_KNOBSSpecification of emittance knobs ready16PU M9.2MS34RPDIFPreliminary Design report of the high power Irradiation test Facility 16CO M3.3MS10OIWDPresentation of the Infrastructure Web-based database to representatives of the TIARA collaborators. 17 CO M1.2MS2OMGMMidterm General Meeting17PU M8.2MS30RACC-DDesign of accelerating structures (prototype and final)18PU M8.3MS31RRF-LLE-DDesign LLRF18PU M9.4MS36RPDCCPreliminary Design study of the low beta SC Cavity test Cryostat 18CO M2.2MS5RI-AMOInterim report of Advisory Mechanisms and Organization18CO M2.4MS7RI-FMNInterim Report on Financial Management Needs18CO

16 Some TIARA Achievements … just a flavour  WP4: Key Accelerator Research Area and Key Technical Issues  WP5: Education and Training Survey and associated database  WP3: Accelerator Infrastructure Survey and associated database  WP6: World lowest emittance achieved at SLS  WP7: RF distribution design of ICTF and first amplifier test  WP8: first accelerating structure and input/output couplers of prototype fabricated

17 Some TIARA Achievements … just a flavour (non-exhaustive)

18 Some TIARA Achievements 1371 trainees in accelerator science and technology in Europe in 2011 (34% undergraduates, 26% master’s students, 14% PhD students, 7% postdoctoral fellows and 17% staff) … just a flavour (non-exhaustive)

19 Some TIARA Achievements 356 companies in 13 countries Established a list of 356 companies in 13 countries (all contacted 89 companies 89 companies expressed interest to be further informed of TIARA developments Concrete actions in preparation  Infrastructures survey: 140 identified so far  Industry … just a flavour (non-exhaustive)

20 Some TIARA Achievements Emittance achievements Best result up to March 16, 2011  Beam height 5  0.5  m RMS  y = 1.9  0.4 pm Vertical emittance WORLD RECORD End 2012:  y = 0.9  0.4 pm with beam of 400 mA … just a flavour (non-exhaustive)

21 Some TIARA Achievements RF distribution design of ICTF and first amplifier test … just a flavour (non-exhaustive)

22 Some TIARA Achievements SPARC test facility upgrade : first C-Band accelerating structure and input/output couplers of prototype fabricated … just a flavour (non-exhaustive)

23 Some TIARA Achievements  WP1: Besides the maintenance of external and internal Websites as well as the documentation database (21 documents so far) New logo Newsletter http://www.acceleratingnews.eu/ Other actions will be presented during the meeting Some other achievements for communication … just a flavour (non-exhaustive)

24 Mid-Term block agenda Madrid June 12th – 15th Draft agenda of the TIARA general mid-term meeting at CIEMAT Madrid, 12-15 June 2012 appr. hour 1st day2nd dayLast day Tuesday 12 JuneWed. 13 JuneThursday 14 JuneFriday 15 June 08:30 or 09:00 Plenary session Highlight Talks Plenary session HT and/or GIT TGC meeting 10:30Break Plenary session Highlight Talks Plenary session WPs reports: WP6, WP7, WP8, WP9 TGC meeting 12:30Lunch Adjourn TGC (13:00) 14:00 Plenary Session Welcome and General Interest Talks WP parallel sessions WP2/WP3/WP4/WP5/ WP6/WP7?/WP8/WP9 ? Plenary session WPs reports: WP3, WP4, WP5, WP2 16:00Break Adjourn WP parallel sessions WP2/WP3+WP4/WP5/ WP6/WP7?/WP8/WP9 ? WP parallel sessions WP2/WP3/(WP4)/WP 5/WP6/WP7?/WP8/W P9? TGC meeting 19:00Adjourn 19:30welcome coktailSocial dinnerTGC Dinner http://events.ciemat.es/web/tiara

25 Conclusions Accelerator science; a powerful mean toward scientific, technical and industrial breakthroughs… TIARA will strengthen further The objectives of TIARA are very ambitious and challenging It is our common task to make it a success and ensure the sustainability of accelerator R&D Work has started and is progressing reasonably well, but there is still a lot to do for this endeavor to be successful …but for now, I wish you a very fruitful meeting