Fall 2002 1 CS-EE 480 University of Portland School of Engineering [Name}[file] Project Bobolink CMOS Authorized Entry System Christina Schulz Krissy Smith Morgan Hurliman Nazia Akil
2
Fall 2002 2 CS-EE 480 [Name}[file] University of Portland School of Engineering Overview Refresher Accomplishments Plans Issues Conclusion
3
Fall 2002 3 CS-EE 480 [Name}[file] University of Portland School of Engineering Refresher CMOS Authorized Entry System Rev 1.0 B2Logic Completed Rev 1.0 Project Plan Completed
4
Fall 2002 4 CS-EE 480 [Name}[file] University of Portland School of Engineering Accomplishments Rev 0.9.tpr file IR Emitter/Sensor Calibration Amplifying Circuit Design Change Control Item Radio Shack Shopping Spree
5
Fall 2002 5 CS-EE 480 [Name}[file] University of Portland School of Engineering Accomplishments cont’d Rev 0.9.tpr File –Last time - B2Logic Design completed –First draft of.tpr file created –Primary check of.tpr file –NO ERRORS!
6
Fall 2002 6 CS-EE 480 [Name}[file] University of Portland School of Engineering Accomplishments cont’d IR Emitter/Sensor Calibration –Lab work -- Trial by Fire –Advisor meeting –CMOS technology - VIL & VIH –Back to the lab –VIL (black) ~.1V & VIH (white) ~4V
7
Fall 2002 7 CS-EE 480 [Name}[file] University of Portland School of Engineering Accomplishments cont’d Amplifying Circuit Design –Electric Strike –Test for Vmin & Imin > 2.5V & 0.7A, respectively –Unity Gain Buffer Circuit –Circuit Configuration Confirmed!
8
Fall 2002 8 CS-EE 480 [Name}[file] University of Portland School of Engineering Accomplishments cont’d Change Control Item –Dropped Backup Battery –Not Mass Producing the Project –Same Function –Change Control Board = APPROVED!
9
Fall 2002 9 CS-EE 480 [Name}[file] University of Portland School of Engineering Accomplishments cont’d Radio Shack Shopping Spree
10
Fall 2002 10 CS-EE 480 [Name}[file] University of Portland School of Engineering Accomplishments cont’d Numbe r DescriptionOrigina l Date Previou s Date Present Date 1Product Pre-Approval09/5/02 09/11/02 2Functional Spec Approval (Product Approval) 09/19/02 10/4/02 3Project Plan Approval10/25/02 4Approval of B 2 Logic Design10/25/02 10/30/02 5Calibration of IR Device11/08/02 11/18/02 6.tpr File Approval and Send Out11/27/02 7Parts Ordered12/2/02 8Design Release12/06/02 9Chip Received From MOSIS03/28/03 10TOP’s Approval02/14/03 11Prototype Release04/04/03 12Founder’s Day Presentation04/08/03 13Final Report04/25/03 Milestones
11
Fall 2002 11 CS-EE 480 [Name}[file] University of Portland School of Engineering Plans Secondary Check of.tpr File > Rev 1.0 Push-button Debouncing Integrating Components Design Release
12
Fall 2002 12 CS-EE 480 [Name}[file] University of Portland School of Engineering Issues/Concerns Checklist/Design Release -- What is expected?
13
Fall 2002 13 CS-EE 480 [Name}[file] University of Portland School of Engineering Conclusion Wrap Up Questions???