Tier1 status at INFN-CNAF Giuseppe Lo Re INFN – CNAF Bologna Offline Week 3-9-2003.

Similar presentations


Presentation on theme: "Tier1 status at INFN-CNAF Giuseppe Lo Re INFN – CNAF Bologna Offline Week 3-9-2003."— Presentation transcript:

1 Tier1 status at INFN-CNAF Giuseppe Lo Re INFN – CNAF Bologna Offline Week 3-9-2003

2 INFN – Tier1 INFN computing facility for HEP community  Location: INFN-CNAF, Bologna (Italy) o One of the main nodes on GARR network  Ending prototype phase this year  Fully operational next year  Personnel: ~ 10 FTE’s Multi-experiment  LHC experiments, Virgo, CDF, BABAR  Resources dynamically assigned to experiments according to their needs Main (~50%) Italian resources for LCG  Coordination with other Tier1 (management, security etc..)  Coordination with Italian tier2s, tier3s  Participation to grid test-beds (EDG,EDT,GLUE)  GOC (deployment in progress)

3 Networking CNAF interconnected to GARR-B backbone at 1 Gbps.  Giga-PoP co-located  GARR-B backbone at 2.5 Gbps. Manager site for the ALICE Network Stress Test

4 New Location CNAF upgrade for Tier1 activity -> New Computing room The present location (at CNAF office level) is not suitable, mainly due to:  Insufficient space.  Weight (~ 700 kg./0.5 m 2 for a standard rack with 40 1U servers). Moving to the final location, within this month.  New hall in the basement (-2 nd floor) almost ready.  Easily accessible with lorries from the road  ~ 1000 m 2 of total space  Not suitable for office use (remote control)

5 Computing units (1) 160 1U rack-mountable Intel dual processor servers  800 MHz - 2.2 GHz 160 1U bi-processors Pentium IV 2.4 GHz to be shipped this month 1 switch per rack  40 FastEthernet ports  2 Gigabit uplinks  Interconnected to core switch via 2 couples of optical fibers 1 network power control per rack  380 V three-phase power as input  Outputs 3 independent 220 V lines  Remotely manageable via web

6 Computing units (2) OS: Linux RedHat (6.2, 7.2, 7.3, 7.3.2)  Experiment specific library software  Goal: have generic computing units o Experiment specific library software in standard position (e.g. /opt/alice) Centralized installation system  LCFG (EDG WP4)  Integration with central Tier1 db (see below)  Each farm on a distinct VLAN o Moving a server from a farm to another changes IP address (not name) Queue manager: PBS  Not possible to have version “Pro” (it is free only for edu)  Free version not flexible enough  Tests of integration with MAUI in progress

7 Tier1 Database Resource database and management interface  Hw servers characteristics  Sw servers configuration  Servers allocation  Postgres database as back end  Web interface (apache+mod_ssl+php) Possible direct access to db for some applications  Monitoring system  nagios Interface to configure switches and prepare LCFG profiles (preliminary tests done)

8 Monitoring/Alarms Monitoring system developed at CNAF  Socket server on each computer  Centralized collector  100 variables collected every 5 minutes o Data archived on flat file – In progress: XML structure for data archives  User interface: http://tier1.cnaf.infn.it/monitor/http://tier1.cnaf.infn.it/monitor/ o Next release: JAVA interface Critical parameters periodically checked by nagios  Connectivity (i.e. ping), system load, bandwidth use, ssh daemon, pbs etc…  User interface: http://tier1.cnaf.infn.it/nagios/http://tier1.cnaf.infn.it/nagios/  In progress: configuration interface

9 Storage Access to on-line data: DAS, NAS, SAN  32 TB (> 70 TB this month)  Data served via NFS v3  Test of several hw technologies (EIDE, SCSI, FC) Study of large file system solutions and load balancing/failover architectures  PVFS o Easy to install and configure but needs tests for scalability and reliability  GPFS o Not so easy to install and configure, it needs test for performances “SAN on WAN” tests (collaboration with CASPUR)

10 Mass Storage Resources StorageTek library with 9840 and LTO drives  180 tapes (100 GB each) StorageTek L5500 with 2000-5000 slots in order  6 I/O drives  500 tapes ordered (200 GB each) CASTOR as front-end software for archiving  Direct access for end-users  Oracle as back-end

11 CASTOR Features  Needs a staging area on disk (~ 20% of tape)  ORACLE database as back-end for full capability (a MySQL interface is also included) o ORACLE database is under day-policy backup  Every client needs to install the CASTOR packet (works on almost major OS’s including Windows) o Access via rfio command CNAF setup  Experiment access from TIER1 farms via rfio, UID/GID protection from single server  National Archive support via rfio with UID/GID protection from single server (moving to bbFTP for security reasons)  Grid-EDG SE tested  AliEn SE tested and working well

12 CASTOR at CNAF 2 drive 9840 4 drives LTO Ultrium SCSI LEGATO NSR (Backup) Robot access via SCSI ACSLS CASTOR STK L180 LAN 2 TB Staging Disk

13 Present ALICE resources CPU: 6 worker nodes bi-processors 2.4 GHz + 1 AliEn server bi-processor 800 MHz (verificare). Some of ALICE CPU’s have been assigned to CMS for its DC Disk: 4.2 TB, but only 800 GB used by AliEn Tape: 2.4 TB, used 1 TB. Computing and disk resources for 2004 at Italian Tier1 and Tier2’s (Catania and Torino) already submitted to the INFN referees. Feedback expected in a couple of weeks.

14

15 Summary & conclusions INFN-TIER1 is closing the prototype phase  But still testing new technological solutions Moving the resources to the final location Starting integration with LCG We are waiting input for the preparation of the ADC04

16

17 Networking CNAF interconnected to GARR-B backbone at 1 Gbps.  Giga-PoP co-located  GARR-B backbone at 2.5 Gbps. LAN: star topology  Computing elements connected via FE to rack switch o 3 Extreme Summit 48 FE + 2 GE ports o 3 3550 Cisco 48 FE + 2 GE ports o Enterasys 48 FE 2GE ports  Servers connected to GE switch o 1 3Com L2 24 GE ports  Uplink via GE to core switch o Extreme 7i with 32 GE ports o ER16 Gigabit switch router Enterasys  Disk servers connected via GE to core switch.

18 LAN TIER1 FarmSW1 (*) FarmSW2(*) FarmSWG1 (*) FarmSW3(*) Switch-lanCNAF (*) SSR2000 Catalyst6500 Fcds1 Fcds2 8T F.C. 2T SCSI NAS2 131.154.99.192 NAS3 131.154.99.193 Fcds3 LHCBSW1 (*) LAN CNAF 1 Gbps GARR 1 Gbps link (*) vlan tagging enabled

19 Vlan Tagging Define VLAN’s across switches  Independent from switch brand (Standard 802.1q) Adopted solution for complete granularity  To each switch port is associated one VLAN identifier  Each rack switch uplink propagates VLAN information  VLAN identifiers are propagated across switches  Each farm has its own VLAN  Avoid recabling (or physical moving) of hw to change the topology Level 2 isolation of farms  Aid for enforcement of security measures Possible to define multi-tag ports (for servers)

20 Remote control KVM switches permit remote control of servers console  2 models under test Paragon UTM8 (Raritan)  8 Analog (UTP/Fiber) output connections  Supports up to 32 daisy chains of 40 servers (need UKVMSPD modules)  Costs: 6 KEuro + 125 Euro/server (UKVMSPD module)  IP-reach (expansion to support IP transport): 8 KEuro Autoview 2000R (Avocent)  1 Analog + 2 Digital (IP transport) output connections  Supports connections up to 16 servers o 3 switches needed for a standard rack  Costs: 4.5 KEuro NPC’s (Network Power Control) permit remote and scheduled power cycling via snmp calls or web  Bid under evaluation

21 Raritan

22 Avocent

23 TAPE HARDWARE

24 Electric Power 220 V mono-phase needed for computers.  4 – 8 KW per standard rack (with 40 bi-processors)  16-32 A. 380 V three-phase for other devices (tape libraries, air conditioning etc..). To avoid black-outs, Tier1 has standard protection systems. Installed in the new location:  UPS (Uninterruptible Power Supply). o Located in a separate room (conditioned and ventilated). o 800 KVA (~ 640 KW).  Electric Generator. o 1250 KVA (~ 1000 KW).  up to 80-160 racks.

25 STORAGE CONFIGURATION CLIENT SIDE (Gateway or all Farm must access Storage) WAN or TIER1 LAN PROCOM NAS2 Nas2.cnaf.infn.it 8100 Gbyte VIRGO ATLAS Fileserver CMS (or more in cluster or HA) diskserv-cms-1.cnaf.infn.it PROCOM NAS3 Nas3.cnaf.infn.it 4700 Gbyte ALICE ATLAS IDE NAS4 Nas4.cnaf.infn.it 1800Gbyte CDF LHCB AXUS BROWIE Circa 2200 Gbyte 2 FC interface DELL POWERVAULT 7100 Gbyte 2 FC interface FAIL-OVER support FC Switch In order RAIDTEC 1800 Gbyte 2 SCSI interfaces CASTOR Server+staging STK180 with 100 LTO (10Tbyte Native) Fileserver Fcds3.cnaf.infn.it