Download presentation
Presentation is loading. Please wait.
Published byRolf Simmons Modified over 8 years ago
2
(Worse) This article is a summary of important developments in cellular manufacturing technology. (Better) This article summarizes important developments in cellular manufacturing technology.
3
Depending on the sentence‘s context, critical, crucial, essential, pertinent, relevant, significant and vital can be used as alternatives to important when the Chinese meaning is 重要.
4
(Worse) The guideline makes it specific that all parties will be notified by the proper authorities when a problem arises. (Better) The guideline specifies that the proper authorities will notify all parties when a problem arises.
5
(Worse) The applicant is in full compliance with accreditation standards. (Better) The applicant fully complies with accreditation standards.
6
(Worse) The proposed procedure makes a provision for a robust manufacturing cell formation in a short execution time. (Better) The proposed procedure provides a robust manufacturing cell forn1ation in a short execution time.
7
(Worse) The procedure is to turn on the required machines at specified time intervals. (Better) The procedure turns on the required machines at specified time intervals.
8
(Worse) Previous literature (4) provided a formal definition of the MCG problem. (Better) Previous literature (4) formally defined the MCG problem.
9
(Worse) The different groups have to reach an agreement on how to make an adjustment of the figures. (Better) The different groups must agree on how to adjust the figures.
10
(Worse) A formal definition of what computer networking is included in this section. (Better) This section formally defines computer networking.
11
(Worse) An assignment of the project schedule to the site manager is made by the foreman. (Better) The foreman assigns the project schedule to the site manager.
12
(Worse) An assessment of project goals is performed by the team leader. (Better) The team leader assesses project goals.
13
(Worse) The machine operator conducts transportation of auto parts to the assembly line. (Better) The machine operator transports auto parts to the assembly line.
14
(Worse) Arrangement of the assigned tasks is coordinated by the laboratory manager. (Better) The laboratory manager arranges the assigned tasks.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.