Download presentation
Presentation is loading. Please wait.
Published byBertram Holland Modified over 9 years ago
1
1 April 2009 CSTS WG: CSTS WG: report to the CSS Area Colorado Springs 25 April 2009 Yves Doat
2
2 April 2009 CSTS WG REPORT CONTENTS A.SUMMARY TECHNICAL STATUS B.INTRA & CROSS-AREA TECHNICAL ISSUES C.OTHER ISSUE AND CONCERNS D.SUMMARY OF MAJOR ACCOMPLISHMENTS
3
3 April 2009 SLE: SLE Services Pink Sheets reviewed Next steps: RID Disposition, Area resolution and publication. CSTSes: Framework: ASN.1 Reviewed Prototype: Coordination & Specification of a dummy service Concept: detail review Guidelines: detail review Introduction presentation will be run before the 3 books review in all Agencies. Monitoring Data Service: Content & structure reviewed. Monitoring will be limited to the specification of the service (No parameters) Monitored parameters will go in a “Data Dictionary” – Book colour Blue (TBC) Others: AOS-CLTU uplink: Status and new version presented by NASA. Final version pending the SLE RIDs disposition. In case IOAG would require an AOS-uplink service to be implemented, the WG recommends to base it the specifications and subsequent implementation on the Framework and Guidelines. Interagency routine file transfer guidelines: Initial brainstorming. CSTS WG REPORT A.SUMMARY TECHNICAL STATUS
4
4 April 2009 Books: Framework, Concept Guidelines, Monitoring Service, Tracking Service Interoperable Prototypes (On-going): Framework: subset of Framework functionality (Transfer of ASCII data) User: Goddard / Provider: ESA Monitoring: subset of service functionality (cyclic delivery) User: Goddard / Provider: ESA Guidelines: Prescriptive book but no prototyping possible status:OKCAUTIONPROBLEM CSTS Books & Prototype X 3 books not covered CSTS WG REPORT New Books: File Transfer Magenta book for CSTS SIID Best Practices. CSTS Reference Model & Monitoring Parameters (Data Dictionary)
5
5 April 2009 CSTS Planning CSTS WG REPORT Project To Secr. Iss,Prototype User Prototype Provider Framework 921.1-R 07/20090.18NASAESA Concept 920.0-G 07/20090.11N/A Guidelines 921.2-R 07/20090.05N/A Monitoring 922.1-R 10/20090.07NASACNES Tracking 922.2-R 01/20100.01TBD RUFT (1) TBD (1) Work Item to be created on CWE
6
6 April 2009 B.INTER- & CROSS-AREA ISSUES Service Instance Identifier for CSTS Services: (Many discussions with SM) Spacecraft Name; Antenna; Transfer Service Profile Identifier. Coding Group (SLE Review) Time tagging: phrasing in SLE books Exclusion of different coding schemes on one physical link CSTS WG REPORT
7
7 April 2009 C.OTHER ISSUES AND CONCERNS Several books to be produced (CSTS SIID best practices, CSTS RM, Data Dictionary, Files Transfer): Editors could not be identified at this stage. CSTS WG REPORT
8
8 April 2009 D.SUMMARY OF MAJOR ACCOMPLISHSMENT SIID Defined for CSTS with support from SM; Prototypes definition and coordination; The 3 books (Framework, Concept and Guidelines) will be published in parallel. CSTS WG REPORT
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.