Download presentation
Presentation is loading. Please wait.
Published byKelley Malone Modified over 9 years ago
1
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Technology Transfer: Moving R&D to Operations Presentation at 2 nd International Conference on Volcanic Ash and Aviation Safety Steven R. Albersheim June 23, 2004
2
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 2 Agenda Purpose Process of the Aviation Weather Technology Transfer Board (AWTT) –Ideas and Concepts –Responsibility –Functionality –Case file –Principals –Stages ICAO Connection Summary
3
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 3 Purpose FAA/NWS needed a means to manage and accelerate new aviation weather products into operations. FAA/NWS needed a means to demonstrate that new products meet service requests of end users.
4
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 4 Before AWTT Users MeetConcepts/Ideas Target Needs Platforms Confusion Which Road do I take?
5
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 5 What Does AWTT Do? Users Meet Concepts/Ideas Target Needs Platforms AWTT Brings these Components Together in an Orderly Process
6
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 6 Responsibility AWTT Board Provides Oversight to: R&D products originating from FAA Aviation Weather Research Program Any change in product content and/or use of FAA or NWS generated product, including those from FAA F&E systems –Product availability to or use by new class of users. –New product or capability requires significant new training and/or education on content and use.
7
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 7 Functionality of AWTT Provide user input to define user needs, requirements, and product design –User Needs Analysis –Concept of Use Approve product graduations from experimental to operational based on: –Technical/scientific readiness –Operational readiness Recommend priorities
8
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 8 Case File Contents Case File UNA*ConUseIP Cost/Benefit* Technical Review Report** * When available ** Includes all documentation presented to Technical Review Panel
9
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 9 Guiding Principals Integrate, don’t proliferate Target replacement of old with new products Use same name wherever possible Avoid contradiction between new and old products Same parameter, severity, location, time = safety Avoid new terminology that does not substantially add value Benefits: Reduced training costs Reduced user confusion
10
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 10 Evolutionary Stages SponsorTestingExperimentalOperational
11
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 11 Operations Operational means: All production/dissemination systems and processes in the initial operational configuration are 24/7 and hardened for reliability Product labeling and other guidance, as required, is in place and training underway to enable intended users to properly employ the product
12
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 12 AWTT Provides Systematic Approach : –Identify how the introduction of a new product reduces proliferation of products and manage unintended regulatory impact User requirements : –Obtain effective input from user experts on product design early on in the process Roadmap: –Identify the path from existing services to a new product suite –Identify regulatory issues that need to be addressed –Identify the priority against other products
13
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 13 ICAO Connection FAA MET Authority to ICAO for Annex 3 –FAA sets and adopts service requirements for U.S. FAA member to International Airways Volcano Watch Operations Group –Group advises Secretary on practices and requirements for VAACs –FAA leads working group to develop U.S. position AWTT Process implements new SARPS. –New products or changes go through AWTT –Products have to be operationally acceptable before implementation on platforms
14
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 14 Summary AWTT is process to operations FAA/NWS through the AWTT accelerates R&D products into operations.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.