Bijou Erosion Control Project Project Kickoff TAC Meeting May 4, 2007 City of South Lake Tahoe ENTRIX, Inc. California Tahoe Conservancy
2
Project Planning Process Existing Conditions Bijou ECP ECAM –“We are not starting at the beginning, we are picking up and finishing what has been started” East Pioneer Trail Watershed Hydrology Study –History of Project/Study –Status of Project/Study –Future of Project/Study
3
Existing Conditions Memorandum East Pioneer Trail Watershed Hydrology Study Items/sections to be completed –Updated Base Map –Drainage Conveyance/Problem Flooding Area Summary –Land Capability Verification –Existing Vegetation Summary –Environmental Resources –Utility Mapping –Photo Monitoring –Groundwater Monitoring –Surface Water Monitoring Completed items/sections –Watershed Map –Drainage Map –Pollutant Source Summary –Pollutant Load Estimates –Land Use Map –Ownership Map –Precipitation Data –Soils and Geology Summary –Impervious Area Summary –Hydrologic Model –Initial Stream Stability Assessment
4
Project Planning Process SWQIC Process (Watershed) Existing Conditions Monitoring Plan Development Formulation of Alternatives Evaluation of Alternatives Selection and Development of Preferred Alternative Construction Phasing Plan Implementation Process (Phased) 30% Design Environmental Documentation 60% Design 75% Design 90% Design Project Permit Applications Final Construction Documents
5
Existing Conditions May 2007 thru September 2007 Formulation of Alternatives September 2007 Thru March 2008 Evaluation of Alternatives March 2008 Thru May 2008 Selection of Recommended Alternative May 2008 thru June 2008 Development of Recommended Alternative (30% plans) June 2008 thru September 2008 Phase 1 Design, Environmental, and Permits September 2008 thru April 2009 Phase 1 Construction Summer 2009 Project Schedule
6
TAC Involvement Key TAC Involvement Times (Commitment) Existing Conditions Memo Review/Meeting –Late August 2007 Formulation of Alternative Mapping Review/Meeting –Early December 2007 Formulation of Alternatives Memo Review/Meeting –Early February 2008 Evaluation of Alternatives Memo Review/Meeting –Mid April 2008 30% Design Review/Meeting –Mid August 2008 60% Design Review/Meeting –Late November 2008 90% Design Review/Meeting –Mid February 2009
7
Q & A City of South Lake Tahoe ENTRIX, Inc. California Tahoe Conservancy