Download presentation
Presentation is loading. Please wait.
Published byJames McCarthy Modified over 8 years ago
1
Information To Assess Right Way Forward Cause of damage Would you have surgery without seeing a physician to see what is wrong? Extent of damage Job blow out Expands to become structural Structural significance of damage If it will not become unsafe or cause loss leave it Likely future damage if left – two extremes If it wont fail in design life leave it A stich in time Prognosis if repaired Some repairs cause more problems than they solve Life Cycle Cost – Cheap and repetitive vs once off and long life
2
Client Interview Ask questions What does he want in terms of Overall Life Aesthetics Operational interference Safety Budget (lowest cost now or long term) Risk Consequence of failure (Likelihood comes from survey) History Design, construction, operation and maintenance Inform Company policy on Approach to assessment and repair Liability involved Risk minimalisation Confirm in writing*
3
Damage Assessment Damage Spalling Cracking Active Corrosion Future Activation Future Damage Survey Method Visual Potential, Drummy Cl-, Carb, Cover Resistivity Polarisation Repair Patch Injection CP Coating Environmental Control
4
Split structure into environments Prepare proformas based on structural assessment detailing & general arrangement expected damage environmental exposure usage Prepare inspection & testing plan Adopt defect classification code
5
Spray Zone Splash Zone Variable Pressure Hollow Leg High Pressure Hollow Leg Intermediate Zone
6
Low Value High Value ComplexSimple Simplicity = Operability x Interpretability Value = Applicability / Cost High Use Low Use IE old 2516 0.2 1 5 IE new/Thick REP IE new/Crack GPR old GPR new LPR CR TP ISAT RCM r DRH
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.