Download presentation
Presentation is loading. Please wait.
Published byOsborn Webster Modified over 8 years ago
1
1 PoGO spring-8 BeamTest preparation Tsunefumi Mizuno and others mizuno@SLAC.Stanford.EDU June 2, 2003 at teleconference
2
2 DAQ setup plan Except for 8 PMTs that will be shipped from Princeton, we have already purchased/borrowed all devices. (Most of them are yet to be configured!)
3
3 Current status We plan to use waveform analyzers that record waveform like a digital oscilloscope does. So far, we have configured single channel data acquisition. Configuring the multichannel/multicard data acquisition is underway. To get the deposit energy distribution, we pickup peak voltages of each event and fill them to a histogram. A sample histogram of the fast scintillator and 241 Am is shown here.
4
4 To do lists Hardware Configuring multichannel/multicard data acquisition. Implementing the veto while data recording. Calibration of 7 PMTs and scintillators. To adjust the high voltage and shaping amplifier. Software To prepare quick-look software to show histograms during data acquisition. To prepare the EGS4/Geant4 simulation program for this Beam Test.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.