Download presentation
Presentation is loading. Please wait.
Published byCaroline Edwards Modified over 9 years ago
1
Plan of Jupiter data production Akiya Miyamoto 19 March 2008 ILD Optimization WG Updates of the presentation at ILD meeting, 7 March, at Sendai
2
Plan to Warsaw Goal: Check consistency between LDCPrime and GLDPrime Obtain physics performances vs detector parameters relation. 2 Akiya MiyamotoTILC08, 4-Mar-2008 Geometries GLD, GLDPrime, J4LDC, Other variants if possible Different BR2 VTX radius, IT configuration Processes resources in Japan is not sufficient to do all SM processes. Priority: Critical background processes Results of LDC/LDCPrime studies will be very useful Study of StdHep files will be useful MC Production is mainly on signal processes R B LDC LDC’ GLD GLD’ J4LDC
3
Production processes Calibration samples: Single particle: , k 0 L, uds quark events (no ISR): √s = 91.18, 200, 300, 500 GeV; 10k(?) events c, b quark events (no ISR): √s = 91.18, 200, 300, 500 GeV; 10k(?) events 3 Akiya MiyamotoTILC08, 4-Mar-2008 Standard StdHep files Signal samples ( √s=500GeV, 500fb -1 ) e + e - pair e + e - top pair Chargino, Neutralino, Smuon pair production SUSY Generator – PhysiSim generator will be used. Background – preselected from the Standard StdHep samples.
4
250 GeV Signal Samples 4 Akiya MiyamotoTILC08, 4-Mar-2008 Signal samples ( √s=250GeV, 250fb -1 ) e + e - ZH eeH, H: Mh=120GeV e + e - ZZ eeZ, Z: e + e - ZH H, qqH Background processes other than ZZ: will be selected from StdHep samples.
5
Beam parameters for 250 GeV 5 Akiya MiyamotoTILC08, 4-Mar-2008 From Andrei Seryi,11 March, Based on his presentation at TILC08
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.