1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities NSLS-II Conventional Facilities Update May 8, 2007.

Similar presentations


Presentation on theme: "1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities NSLS-II Conventional Facilities Update May 8, 2007."— Presentation transcript:

1 1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities NSLS-II Conventional Facilities Update May 8, 2007

2 2 BROOKHAVEN SCIENCE ASSOCIATES Outline CD-1 Review Scope WBS Advance Procurements CR Impacts Organization Schedule Cost Risks Path Forward

3 3 BROOKHAVEN SCIENCE ASSOCIATES CD-I review was generally very favorable Relevant CD- I review recommendations Increase CF Contingency to reflect construction volatility Look at alternatives to HD concrete for shield wall Add ratchet wall shield doors for front end access Maximize use of existing facility space Consider compact booster vs in-tunnel Support additional beamlines in base scope CD-I Review - December 2006

4 4 BROOKHAVEN SCIENCE ASSOCIATES CD-I review scope impacts Opted for Compact Booster instead of in-tunnel Adds ~15 ksf + more power/utilities requirements Reevaluated shielding criteria Enabled elimination of most shield wall HD Concrete Added 60 ratchet wall shield doors Eliminated CLOB – will use existing NSLS Reduces by ~46 ksf – now depend on NSLS space Increased # & size of LOB ’ s in base scope Adds net ~ 63 ksf – for beamline support Scope

5 5 BROOKHAVEN SCIENCE ASSOCIATES CF Technical Performance Goals Structurally stable facility with low vibration (<25nm Rms) Tunnel design that provides required shielding and accessibility Tunnel temperature stability of +/- 0.1 deg C Utility capacity for up to 3.6 GeV operation Utility services & expansion capability to support full beamline build-out Facility layout enabling future long beamlines Experimental Floor noise level <NC60 Design for LEED Certification to meet sustainability requirements (DOE likely to require LEED Gold Rating)

6 6 BROOKHAVEN SCIENCE ASSOCIATES NSLS LOB Typ 4 1 in Base Scoope, 3 Future RF-LINAC AREA Service Bldg Typ 4 CFN Ring Bldg Future JPsi Future Guest House Future Conf. Center Underpass Loading CLOB Scope at Previous Review

7 7 BROOKHAVEN SCIENCE ASSOCIATES Current NSLS II Facility Overview Access Tunnel LOB (1 of 3) JPSI NSLS CFN BLOC NSLS II Service Bldgs (1 of 5) CHW Plant Bldg 603 Substation Future LOB ’ s

8 8 BROOKHAVEN SCIENCE ASSOCIATES NSLS II Facility Overview cont ’ d NSLS II Floor Plan 1. BLOC – Booster/LINAC/ Operations Center 2. LOB – Lab Office Buildings (3 base scope up to 5 future) 3. Service Buildings (5) 4. RF Area 5. Tunnel Area 6. Electrical Mezzanine 7. Experimental Floor 8. Access Corridor 1 4 3 2 2 2 2 2 3 3 3 3

9 9 BROOKHAVEN SCIENCE ASSOCIATES NSLS II Facility Overview cont ’ d Access Corridor Lab-Office Bldg SR Tunnel Experimental Floor Service Bldg 1 st Floor (earlier concept) 7 5 8 6 Electrical Mezzanine (above tunnel)

10 10 BROOKHAVEN SCIENCE ASSOCIATES Compact Booster 1 st Floor Plan Operations Center Entry Lobby Linac Injection to Booster Booster Injection to Storage Ring

11 11 BROOKHAVEN SCIENCE ASSOCIATES Compact Booster 2 nd Floor Plan Operations Center Viewing Gallery and Bridge to Control Room Area Linac Klystrons Booster RF, Magnet Power Supplies, Cooling Systems and HVAC Service Areal Control Room Area

12 12 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Section Ratchet or Shield Wall Electrical Mezzanine Bldg structure Isolated from tunnel and experimental Floor Earth Shield Berm Experimental Floor Access Corridor Tunnel Floor “ Monolithic Joint ” Isolation Joint Isolation Joint or Void Space Tunnel Roof Isolated Pier for Column Isolated Grade Beam

13 13 BROOKHAVEN SCIENCE ASSOCIATES Facility Program

14 14 BROOKHAVEN SCIENCE ASSOCIATES WBS 1.5

15 15 BROOKHAVEN SCIENCE ASSOCIATES Advance Procurements Previous Plan to expedite schedule & reduce risk Early construction package for site preparation Early procurement of HD concrete material for shield wall Prepared advance procurement T-1 packages in Jan 07 Funding for early procurement is not available in FY08 Resolved by elimination of most HD concrete in shield wall HD concrete only needed in injection regions Will try to perform minimal site prep in early FY09 to hedge schedule risk

16 16 BROOKHAVEN SCIENCE ASSOCIATES Continuing Resolution Impacts Prior Schedule had CD-1 in February, now likely in June Result - Funding for T-I delayed and limited Goal – minimize schedule impacts Approach Establish basic ordering agreement contract with selected A/E [HDR] Issue tasks for Advance Conceptual Design (ACD) to progress investigation of design concepts and alternatives Revise T-I A/E scope to address specific T-I deliverables Result – maintained overall schedule goal of readiness for CD-2 in 1 st Qtr FY08 Lehman review and EIR scheduled for early November

17 17 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Organization Conventional Facilities Director M. Fallier Design A/E T-I, I, III TBD [C] Asst. Director CF Design Management O. Dyling Commissioning Contractor TBD [C] PE Trade Shop Support – Various [M] Design A/E Subconsultants [C] Construction Management PM Agent CM – TBD [C] I C & C Project Manager TBD Civil Construction Project Manager TBD Building Project Manager TBD Chilled Water Project Manager TBD [M] – Matrixed [C] - Contracted Asst. Director CF Construction Management TBD ESH Manager Design Review Industrial Hygiene Health Physics Construction Safety Admin & Finance Procurement Project Controls Document Mgt Human Resources Information Management NSLS II Project Director S. Dierker CF Advisory Committee J. Hands, Chair Construction Analysts [C] Project Schedulers [C] Field Inspectors [C] Cost Estimators [C] ASD & XFD Technical Interface Managers ASD - E. Johnson, EFD- TBD Site Prep Contractor [C] Building Contractor [C] CHW Contractor [C] Construction Safety Specialists [C] IC&C Contractor [C] Project Architect T. McEvaddy [M] Mech. Engineer G. Leskody [M] Civil/Struct. Engr. T. Joos [M] Elect. Engineer D. Danseglio [M] Sr Mech. Engr. C. Channing [M] ECS Design Supervisor J. Mills [M] QA Manager QA Review

18 18 BROOKHAVEN SCIENCE ASSOCIATES CF Schedule Title I Design CD-2 Title II Design CD-3 Site Prep. Const. (reduced) Pre-cast Shield Wall Const. Ring Bldg Bid & Award 1st Pentant RFE (Pentant 1) 2 nd Pentant RFE (Pentant 5) 3 rd Pentant RFE (Pentant 2) 4 th Pentant RFE (Pentant 3) 5 th Pentant RFE (Pentant 4) BLOC & 3 LOB ’ s CHW Plant Expansion Mech & Elect Utilities Integrated Ctrl & Comm. Standard Equipment Commissioning Activity FY07FY08FY09FY010FY11FY12 FY13 Begin Accelerator Installation Full Ring Bldg Available for Accelerator Installation Control Room RFE LOB ’ s Complete BO for all CF Construction No LLP

19 19 BROOKHAVEN SCIENCE ASSOCIATES Cost Estimate

20 20 BROOKHAVEN SCIENCE ASSOCIATES Risk Assessment Technical Challenges Constructing massive concrete tunnel with reasonable economy Achieving structural stability Vibration mitigation Minimizing differential settlement Achieving thermal stability – Tight temperature constraints for tunnel Assuring interior/exterior thermal gradients don ’ t affect beam Making tunnel available for accelerator installation in phases Cost Risks Cost sensitivity of achieving all of the above Volatile material/construction markets

21 21 BROOKHAVEN SCIENCE ASSOCIATES Risk Assessment Cont ’ d Schedule Risks Title I & II Engineering are on the critical path Construction of Ring building up to the point that the accelerator tunnel is available for accelerator installation is critical path Any delays to the above may require added cost to remedy Risk registry has been prepared Risk assessment database integrated with cost estimate database Current Contingency allocated for Conventional Facilities ~ 40%

22 22 BROOKHAVEN SCIENCE ASSOCIATES CF Path Forward Continue driving ACD process to finalize concepts for T-I Freeze accelerator lattice design – Ring bldg footprint Confirm program requirements Confirm siteplan and geotechnical suitability Continue benchmarking study of other LS facilities Continue focused technical studies (vibration, thermal modeling) Expedite award of A/E T-I contract when CD-I is received Execute T-I design plan (Ove will present in detail) Expedite agent CM award for T-I, T-II support services Prepare supporting documents for CD-2