Former DuPont Barksdale Works Project Update May 19, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center
2
May 19, 2004Former DuPont Barksdale Works Project Update2 Purpose of Presentation n Provide an update on the alternative water supply project n Provide update on additional project work conducted since the January 2004 public meeting and planned work for 2004
3
May 19, 2004Former DuPont Barksdale Works Project Update3 Presenters n Brad Nave – Project Director, DuPont Corporate Remediation Group (CRG) n Cary Pooler – Project Manager, URS Corporation
4
Alternative Water Supply Project
5
May 19, 2004Former DuPont Barksdale Works Project Update5 Background of Proposed Project Alternative Water Supply n Groundwater near the former Barksdale Works is contaminated with compounds associated with DuPont’s former explosives manufacturing activities n DuPont has made a commitment to make an alternative water supply available to eligible home and property owners n DuPont evaluated several water supply options and a pipeline from Washburn to Barksdale is the leading option
6
May 19, 2004Former DuPont Barksdale Works Project Update6 Background of Proposed Project Alternative Water Supply n DuPont committed to provide the following to eligible home and property owner’s in Barksdale – Finance and build an alternative water supply – Pay for operations and maintenance – Pay for water used (within generous limits) for as long as the eligible residents own their home
7
May 19, 2004Former DuPont Barksdale Works Project Update7 Pipeline Construction Update Alternative Water Supply n Agreement between Barksdale, Washburn, and DuPont signed on January 28 th – DuPont will build the system – Washburn will operate and maintain the line n Ordinance adopting agreement was passed by Washburn on March 8 th n To date 33 owners have signed up for water – Remaining eligible owners are encouraged to sign the agreement
8
May 19, 2004Former DuPont Barksdale Works Project Update8 Eligible Properties
9
May 19, 2004Former DuPont Barksdale Works Project Update9 Pipeline Construction Update Alternative Water Supply n Pipeline design is at 90% – Currently incorporating comments from permitting agencies, Washburn, and bidders – Need feedback from individual homeowners for curb stop and lateral line routing n Bid meeting held on May 18 th – Super Excavators – Reuben Johnson – Summit Environmental – S. J. Lewis – S. R. Weidema n Bidding will occur June 11 th n Construction start anticipated for Summer 2004
10
May 19, 2004Former DuPont Barksdale Works Project Update10 Construction Permits Alternative Water Supply n Permits required from – WDNR n Approval to build pipeline n Stream crossings n Erosion control – US Army Corps of Engineers n Environmental permit – Bayfield County n Shoreline grading – Department of Transportation n Right-of-way occupancy n All permits currently in review and are anticipated to be issued by July
11
May 19, 2004Former DuPont Barksdale Works Project Update11 Chris Curran n Assistant Project Manager n Responsible for Barksdale pipeline design n Has lateral line sketches for those who have signed water agreements
12
May 19, 2004Former DuPont Barksdale Works Project Update12 Eric Bryan n Construction Engineer and Contract Administrator
13
May 19, 2004Former DuPont Barksdale Works Project Update13 Bill Barnes n Construction Manager and Site Safety Officer n Bill will be the primary contact for lateral line installation
14
Other Barksdale Site Work
15
May 19, 2004Former DuPont Barksdale Works Project Update15 Residential Monitoring n April 2004 sampling results (10 potable wells) will be transmitted to WDNR shortly – Preliminary results indicate no detections of site- related compounds n Annual change-out of carbon cylinders was completed in March/April 2004 – Two seasonal homes remain n Next sampling event will be conducted in September (approximately 82 homes)
16
May 19, 2004Former DuPont Barksdale Works Project Update16 Site Investigation n Trenching and further sampling in production areas is starting May 24 th – Using robotic equipment – 33 areas to be excavated – Focusing within the former manufacturing area n 10 new monitoring wells will be installed in the summer n Additional groundwater sampling to be conducted in late summer/early fall
17
May 19, 2004Former DuPont Barksdale Works Project Update17 Site Investigation (continued)
18
May 19, 2004Former DuPont Barksdale Works Project Update18 Miscellaneous Site Work n Continuing work with Adventus to evaluate a new generation of soil amendments to reduce concentrations of nitroaromatic/nitramine compounds in soil – Generation 3 product uses nano-scale zero valent iron
19
May 19, 2004Former DuPont Barksdale Works Project Update19 Home Value Protection Program n 30700 Nolander - sold in April n 72450 Highway 13 - DuPont accepted purchase offer earlier this month n 72410 Highway 13 - DuPont has made offer to purchase
20
May 19, 2004Former DuPont Barksdale Works Project Update20 Questions or comments?