Large Truck Manufacturing Facility Flow Planner Software Results
2
Leaders in Manufacturing Process Engineering Introduction Project to Document and Calculate Material Flow Compile Material Handling Routing File Generating Material Flow Diagrams Create Flow Results Report & Indirect Labor Determine Material Handling Utilization Levels Evaluate Better Receiving Dock Assignments
3
Leaders in Manufacturing Process Engineering Routing File Data Collection Product Name – Truck Model Number Part Name –Part Number Percent Flow – Percent of Parts Being Moved to Different Locations From Location Name – Dock Information Method Name – Fork Lift Information Container Name - Pallet Containers per Trip – Number of Containers Moved per Trip Parts per Container – Standard Pack Information To Location Name – Line Location Via Location Name – Drop Zone Information Via Method – Forklift Information Via Containers Per Trip – Number of Containers Moved per Trip
4
Leaders in Manufacturing Process Engineering Routing File 2300 Routings from Dock to Drop Storage to Line
5
Leaders in Manufacturing Process Engineering Part Quantity File Assigned Part Quantities to Departments
6
Leaders in Manufacturing Process Engineering Material Handling Assumptions MH Parameters
7
Leaders in Manufacturing Process Engineering Layout File AutoCAD Drawing (.dwg) of Facility Layout
8
Leaders in Manufacturing Process Engineering Straight Line Flow Study Straight – Line Material Flow by Department
9
Leaders in Manufacturing Process Engineering Aisle Based Material Flows Aisle Based Flows for all MH devices at 100%, 50%, 40% Efficiency
10
Leaders in Manufacturing Process Engineering Flow Results Material Flow Summary for all Moves (Using Aisle Network) Aisle FlowsTotal Distance (Feet) Total Time (Minutes)Travel Time (Minutes) Total Cost 100% Efficiency11,684,370.003,619,156.32,655,537.37$20,106.42 50% Efficiency23,368,730.006,274,693.75,311,074.73$34,859.41 40% Efficiency29,210,910.007,602,462.36,638,843.31$42,235.90
11
Leaders in Manufacturing Process Engineering Material Handling Device Utilization Material Handling Utilization for all Devices (Using Aisle Network) METHODQUANTITY TRAVEL TIME MINUTES L/UL TIME MINUTES TOTAL TIME MINUTES AVAIL TIME/QTY UTILIZATION FORK-D2038,579.7112,741.7551,321.46220,000.0023.33% FORK-L45,679.253,318.568,997.8144,000.0020.45% 100% TOTAL2444,258.9616,060.3160,319.27264,000.0022.85% FORK-D2077,159.4112,741.7589,901.16220,000.0040.86% FORK-L411,358.503,318.5614,677.0644,000.0033.36% 50% TOTAL2488,517.9116,060.31104,578.22264,000.0039.61% FORK-D2096,449.2712,741.75109,191.02220,000.0049.63% FORK-L414,198.123,318.5617,516.6844,000.0039.81% 40% TOTAL24110,647.3916,060.31126,707.70264,000.0048.00%
12
Leaders in Manufacturing Process Engineering Dock Flows Dock 1 to all Drop Storage Zones
13
Leaders in Manufacturing Process Engineering Dock Flows Dock 2 to all Drop Storage Zones
14
Leaders in Manufacturing Process Engineering Dock Flows Dock 3 to all Drop Storage Zones
15
Leaders in Manufacturing Process Engineering Distance Intensity Study Over 100 parts being taken over 500’ more then 10 times per 10 days Example: Part NameFromToFrequencyCalculated Distance 28588R1A254118.8805'-7" 2040958C1A233714.5712'-8" 25222R1A233710.5712'-8" 1677908C1A240145701'-6" 1518208C1A240121.5701'-6"
16
Leaders in Manufacturing Process Engineering Summary – Flow Report calculated MH Cost of $34,859.41 per 10 Days – MH Utilization Report Indicates Forklift Utilization below 40% – Dock flow study shows many parts could be received at closer docks – Working with IEs to develop Material Flow Database to document further improvements – Working with IEs for tugger analysis and dock capacity studies Tugger Route Generator Dock Capacity Calculator