OP RESTORE CHIANTI Confidence survey of main shipping channel USN Fleet Survey Team JS Bungo RNZN Mine Counter Measures Team.

Similar presentations


Presentation on theme: "OP RESTORE CHIANTI Confidence survey of main shipping channel USN Fleet Survey Team JS Bungo RNZN Mine Counter Measures Team."— Presentation transcript:

1 OP RESTORE CHIANTI Confidence survey of main shipping channel USN Fleet Survey Team JS Bungo RNZN Mine Counter Measures Team

2 Overview Aircraft debris obstructing channel at approx coordinate 21° 22.27’N 157° 56.58’W. –CTG 17.2 and CTG 11.1 tasked for harbor clearance ops. No significant variation in charted depths Three navigation markers (buoys G1, R2, R4) displaced [Real World Caveat: channel is safe, no actual obstructions]

3

4

5 Route Leg 1. 334° Leg 2. approx 345° Leg 3. approx 005° Leg 4. approx 020°

6 Tides NOAA predicted for PEARL HARBOR ENTRANCE, BISHOP POINT –Station ID# 1612366 Time = LST(W) Heights = metres Mixed (semi-diurnal with large inequality) SD / CD = MLLW MSL = 0.251 above MLLW

7 16 Jul 12 HW 02:22 0.20m LW 07:34 0.00m HW 15:14 0.66m LW 22:31 0.08m 17 Jul 12 HW03:09 0.21m LW08:15 0.00m HW15:47 0.67m LW22:56 0.06m

8 18 Jul 12 HW03:51 0.22m LW08:57 0.00m HW16:18 0.67m LW23:20 0.04m 19 Jul 12 HW 04:29 0.24m LW09:39 0.02m HW16:46 0.66m LW23:44 0.04m

9 20 Jul 12 HW05:06 0.26m LW10:20 0.05m HW17:13 0.63m 21 Jul 12 LW00:10 0.03m HW05:48 0.29m LW11:03 0.09m HW17:41 0.59m

10 This product was brought to you through the care and attention of the USN FST (CTU 11.7) and RNZN MCMT (CTU 17.2).


Download ppt "OP RESTORE CHIANTI Confidence survey of main shipping channel USN Fleet Survey Team JS Bungo RNZN Mine Counter Measures Team."