1 SSD Status Report July 20021 SSD Status Report http://star.in2p3.frhttp://star.in2p3.fr accessible from STAR group documents Pictures Updated documentation

2 SSD Status Report July 20022 SSD Barrel : Overview |  | < 1.2 Ø= 460 mm  z = 740  m  r  = 20  m 20 ladders 320 2D Si strips 491520 channels Readout < 5ms

3 SSD Status Report July 20023 SSD Ladder : Overview

4 SSD Status Report July 20024 SSD Module Silicon Wafer TAB Hybrid Circuit

5 SSD Status Report July 20025 SSD module assembly

6 SSD Status Report July 20026 First Ladder : Assembly 1.Flexible hybrid – Cable bus connection : Z-axis glue 2.Precise positioning of the modules on a granite beam : 3D machine/zoom/camera 3.Modules – carbon fiber beam connection : gluing on the granite beam. Steps 2 and 3 : 2,5 days + 1 to 2 days for curing

7 SSD Status Report July 20027 First Ladder Equipped Top view End view Bottom view Side view

8 SSD Status Report July 20028

9 9

10 10

11 SSD Status Report July 200211

12 SSD Status Report July 200212

13 SSD Status Report July 200213 First Ladder : Tests and lessons Assembled in November 01 –All hybrids working but one due to a human error –Moved several times –Flex-Bus glue fix on ladder –Powered On/Off several times –Mylar wrapped twice –Still working !!! Modules : –Bad wire bonds on the Costar : fixed –Geometry out of specs : to be fixed Carbon Fiber structure : –Shape and conductive part : fixed –Stiffness OK but can do better : internal stiffeners added ADC and C2D2 boards : –Few routing bugs, weak regulator, clean power Off : last version ReadOut board : –Slow control interface OK –DAQ interface OK –Additional pedestal offset OK –Few routing bugs : last version

14 SSD Status Report July 200214 First Ladder : Online monitoring Costar monitoring : temperature, I guard, I bias, V DD, V SS Pedestal offset and pedestal reference (not shown) Working Costar (in green)

15 SSD Status Report July 200215 First Ladder : Performances Uniform signal amplitude on the modules (both sides) S~50 mV Noise higher on the N-side : – N N ~2 to 2.5 mV N P ~1.5 mV S/N(P) ~ 30 S/N(N) ~ 20 to 25 No significant dependence of the noise level on the : –Power supplies –Inside/Outside temperature –Cooling strength –Ladder orientation –Leakage current Main contribution probably the coupling capacitance –N N to N P difference –N varies with the strip length NoiseP NoiseN SignalN SignalP

16 SSD Status Report July 200216 First Ladder : cooling test 10 W 3 W 33.1 o C 33.7 o C 27.6 o C 33.2 o C 30.7 o C 24.5 o C 25.1 o C 30.9 o C 27.8 o C 19 o C 29 o C

17 SSD Status Report July 200217 Summer’02 Installation readiness ElementDesignStatus Ladder ModuleFinalReady ADC boardLast PrototypeReady Connection boardLast PrototypeReady Carbon FiberLast PrototypeReady Mechanical Structure on the coneSpecificReady ReadOut BoardLast PrototypeReady Power SuppliesFinalReady Slow ControlFinalOn test DAQMicroDaqOn test Cooling systemFinalReady

18 SSD Status Report July 200218 Summer’02 Installation schedule Action (duration in weeks)Meeting JulyFull chain test (3)Integration Shipping (1) AugustLadder and Readout Chain tests (2)Safety Review Mech. Brackets on the cone (0,5) Utilities installation (2)ORR SeptemberLadder/RDO board installation (2) October November Cooling system connections (0,5) Test/Data taking start WinterMicroDaq to STAR Daq switch

19 SSD Status Report July 200219 SSD readiness : overview ElementDesignStatus Ladder Wafer, ChipFinalReady HybridFinalProduced on demand ModuleFinalSlowed Down ADC, C2D2 boardsFinalDesigned Carbon Fiber BeamFinal½ produced Cable BusFinalProduced on demand Mechanical StructurePrototypeAwaiting the SVT installation ReadOut BoardPrototypeAwaiting the ladder installation Power SuppliesFinalReady Slow ControlFinalOn test DAQSimplifiedBeing developed with the ladder 1 Cooling systemFinalReady

20 SSD Status Report July 200220 SSD readiness : module production Tender with Thales (formerly Thomson-Detexis, formerly Dassault) for the module production (connections and hybrid folding). 20 modules produced until October’01 (first ladder) Financial crisis in winter’01 : addendum to the contract Module production resumed in March’02 Technical crisis in April’02, 9 new modules produced : –Thales subcontracts its production to Bull –None electrically working, 3 silicon wafers broken –Out of geometrical specs (TAB extend twice bigger) –Production stopped, analysis of production processes –New production processes and tooling developed. –Production resuming. Working modules produced, folding and geometry not checked yet.

21 SSD Status Report July 200221 SSD readiness : Installation Strongly depends on the Thales production capabilities (unique producer on the market) 4 modules by the end of July, 12 modules in September : next assembled ladder in October. Increase of the production speed with high yield in Fall’02 Last modules for the full barrel by May’03 Half barrel ready for the summer’03 Second half possibly ready but its installation depends on the next RHIC shutdown

22 SSD Status Report July 200222 Debut des transparents de secour

23 SSD Status Report July 200223

24 SSD Status Report July 200224

25 SSD Status Report July 200225 The SSD cooling system : inside STAR This Somewhere here

26 SSD Status Report July 200226 The SSD Cooling system :outside STAR On the pole tips On the wall