Download presentation
Presentation is loading. Please wait.
Published byJoy Kennedy Modified over 8 years ago
1
Concrete Barrier placed at unauthorized median at Ch.263.800.
2
Painting of Concrete Barriers at 2 nd Toll Plaza at Ch.276.135. Concrete Barricade at unauthorized median cut at Ch.272.600.
3
Cleaning of Gutter at Tatibandh Circular Junction.
4
Cleaning of Trapezoidal Drain at Ch.279.500 LHS.
5
Asphalt Sealing of Pavement at Ch.256.500 RHS. 1 st and 2 nd PSC Girder launched at Sarona ROB at Ch.280.650.
6
All 9 nos. PSC Girder in place at ROB Sarona at Ch.280.650. Deck Slab preparation for Sarona ROB at Ch.280.650.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.