Presentation is loading. Please wait.

Presentation is loading. Please wait.

MAE 435 Progress Report 2/19/13. MAE 435W Facebook/twitter Shop clean-up Marketing meetings Engineering/club open houses Printed and reviewed rule book.

Similar presentations


Presentation on theme: "MAE 435 Progress Report 2/19/13. MAE 435W Facebook/twitter Shop clean-up Marketing meetings Engineering/club open houses Printed and reviewed rule book."— Presentation transcript:

1 MAE 435 Progress Report 2/19/13

2 MAE 435W Facebook/twitter Shop clean-up Marketing meetings Engineering/club open houses Printed and reviewed rule book

3 Aerodynamics Team Mock-up/measurements Input designs (SolidWorks) Created clean room (Fiberglass work) Inventory safety equipment Created budgets

4 Chassis Team Created front suspension: Control arms Uprights Spindles Created rear suspension: 4 new points (shorten control arm length) New brackets (to reuse previous uprights) Designing brake mounts Created Steering Column/Rack and pinion mount

5 Powertrain Team Engine mounting Oil pan design and fabrication Cooling system Differential mount Intake Fuel system


Download ppt "MAE 435 Progress Report 2/19/13. MAE 435W Facebook/twitter Shop clean-up Marketing meetings Engineering/club open houses Printed and reviewed rule book."

Similar presentations


Ads by Google