1 Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014

2 AWAKE is going to happen, it is just a question of when. Many defining decisions are lagging behind. Only swift reflection and subsequent action can ensure a start-up with physics before CERN’s LS2.

3 Preview Installation – Recent Additions – Coming Soon Integration – Control Room – Available Models – Missing Information Infrastructure – Missing Information

4 Preview Installation – Recent Additions – Coming Soon Integration – Control Room – Available Models – Missing Information Infrastructure – Missing Information

5 Recent Additions Walls for shielding and air separation: protect AWAKE from radiation and contamination Electron beam tunnel: connect ventilation chamber (e-source) with proton beam tunnel

6 Electron Beam Tunnel Excavation

7

8

9 Preview Installation – Recent Additions – Coming Soon Integration – Control Room – Available Models – Missing Information Infrastructure – Missing Information

10 Cable Removal In order to free cable trays for AWAKE, the CNGS horn and reflector power cables will be removed late 2014.

11 Cable Removal

12 60m 20m 1000m

13 Cable Removal In order to free cable trays for AWAKE, the CNGS horn and reflector power cables will be removed late 2014. Reward: 2 cable trays for power converters & ˜25kCHF (100-75)

14 Cable Removal In order to free cable trays for AWAKE, the CNGS horn and reflector power cables will be removed late 2014. Reward: 2 cable trays for power converters & ˜25kCHF (100-75) ˜15kCHF (90-75)

15 Cable Removal In order to free cable trays for AWAKE, the CNGS horn and reflector power cables will be removed late 2014. Reward: 2 cable trays for power converters & ˜25kCHF (100-75) ˜15kCHF (90-75) …… Cost of 5kCHF (90-95)

16 More Works To Come: Early 2015 Power cable pulling for spectrometer & quadrupole magnets (kilometers) Rack installation and cable pulling (kilometers) Magnet cable modifications and survey of proton beam lines Laser room service installation

17 Preview Installation – Recent Additions – Coming Soon Integration – Control Room – Available Models – Missing Information Infrastructure – Missing Information

18 AWAKE Control Room Found Level -2 access pit ˜50 square meters Refurbishment desperately needed

19 Preview Installation – Recent Additions – Coming Soon Integration – Control Room – Available Models – Missing Information Infrastructure – Missing Information

20 Current Integration Model A release is planned for early October, resulting in 3D-Via & pdf files. In the mean time, use the model of the experimental area from TB 25/8 (indico)

21

22 Preview Installation – Recent Additions – Coming Soon Integration – Control Room – Available Models – Missing Information Infrastructure – Missing Information

23 Current Experimental Area Layout Laser dump & BTV (x2) 2-meter long diagnostics structure 2 quads Spectrometer … and much more, of course

24 Needed to design vacuum equipment Plasma cell end Diagnostics table layout and vacuum interface Spectrometer choice Camera and rack locations (x2) (see also Edda’s TB summary talk)

25 Needed to continue integration Location of racks, optic tables, camera “near” diagnostics table and spectrometer

26 Preview Installation – Recent Additions – Coming Soon Integration – Control Room – Available Models – Missing Information Infrastructure – Missing Information

27 Racks in Underground Area AWAKE “sit down and think through the experiment “ Control unit either underground (20-100m away) or in control room (1km away  long cables) Underground controller’s location (rack): -Maximum distance from equipment (timing, signal loss, …) -Volume needed – space available in tunnel -Radiation safe areas (see Silvia’s presentation)

28 Racks in Underground AWAKE Rack installation: January 2015. Overhead Crane CNGS & General Services  TSG4 – 20-100m

29 @20m @50m (and another 60m available) Service Gallery TSG4

30 Cables and Services 1km long cables need to be identified (reuse CNGS cables) or ordered Cooling pipes need to be re-routed or installed Electrical layout (outlets and connections) needs to be designed Compressed air anyone? UPS back-up? Other?

31 If… Then…When If you need…. Then tell us… In the next 2 weeks Rack space  how much & where (max.) Long cables  specification, start, end Electrical power  what & where Other services  what & where

32 Also Waiting For… Plasma cell model (integration, installation) Choice of separation window (radiation) Choice of spectrometer (cabling, installation)

33