WPSS Phase 2 – CERN 14/762012
2
PTU Phase 2 Specifications and hardware designs Use Cases PTU Architecture Hardware Designs Enclosure Integration Process Software - DAQ System Sensing Software DAQ PTU software DAQ Server software DataBase Messages format Scheduling - Milestones WPSS Phase 2 – CERN 14/762012
3
PTU Phase 2 Specifications and hardware designs Use Cases PTU Architecture Hardware Designs Enclosure Integration Process Software - DAQ System Sensing Software DAQ PTU software DAQ Server software DataBase Messages format Scheduling - Milestones WPSS Phase 2 – CERN 14/762012
5
PTU Heart Beat Sensor Dosimeter Camera /Leds Speaker/Microphone Batteries Sensors Body Temperature WPSS Phase 2 – CERN 14/762012
18
Software - DAQ System PTU Phase 2 Specifications and hardware designs Use Cases PTU Architecture Hardware Designs Enclosure Integration Process Software - DAQ System Sensing Software DAQ PTU software DAQ Server software DataBase Messages format Scheduling - Milestones WPSS Phase 2 – CERN 14/762012
19
PTU Software Language: C Operating System: ISOS Language: C++ Operating System: LINUX Language: C# Operating System: Windows Server 2003 WPSS Phase 2 – CERN 14/762012
22
Header { "Sender": "PTU123", "Receiver": "Broadcast", "FrameID": "357", "Acknowledge": "False", Messages "Messages": [ { }, { }, { }, { }, { } ] } { "Type":"measurement", "Sensor":"CO2", "Time":"12/3/2012 15:24:30", "Method":"OneShoot", "Value":"123", "Samplerate":"", "Unit":"mm3" } { "Type":"event", "Sensor":"Temperature", "EventType":"Up level", "Time":"12/3/2012 15:25:30", "Value":"12" } { "Type":"error", "ErrorNo":"1254", "Description":"Wrong message", "Time":"12/3/2012 15:25:30", "Criticality":"low" } { "Type":"report", "BatteryLevel":"80", "CameraHandheld":"0", "Time":"12/3/2012 15:25:30", "CameraHelmet":"1", "Audio":"1" } { "Type":"order", "Sensor":"Humidity", "Parameter":"SamplingRate", "Value":"1000" } WPSS Phase 2 – CERN 14/762012
23
Scheduling - Milestones PTU Phase 2 Specifications and hardware designs Use Cases PTU Architecture Hardware Designs Enclosure Integration Process Software - DAQ System Sensing Software DAQ PTU software DAQ Server software DataBase Messages format Scheduling - Milstones WPSS Phase 2 – CERN 14/762012
24
Scheduling WPSS Phase 2 – CERN 14/762012
25
Milestones Milestone TitleTime 1Final Enclosure DesignEnd of Task 1 2PTU 1 IntegrationEnd of Task 8 3PTU 1 Performance EvaluationEnd of Task 9 4Helmet Camera IntegrationEnd of Task 20 5Handheld Camera IntegrationEnd of Task 25 6Final PTU IntegrationEnd of Task 12 7Field TestsEnd of Task 14 WPSS Phase 2 – CERN 14/762012
26
Meetings Metting TitleTimePlace 1Enclosures ReviewEnd of Task 1Teleconference 2PTU 1 EvaluationDuring Task 9Athens 3Final PTU PresentationDuring Task 13CERN 4Project EvaluationAfter the field testsCERN WPSS Phase 2 – CERN 14/762012