Download presentation
Presentation is loading. Please wait.
Published byCamilla Jennings Modified over 8 years ago
1
Mr C Johnston ICT Teacher www.computechedu.co.uk BTEC IT Unit 05 - Lesson 13 Routine Network Management Tasks
2
Session Objectives Understand the purpose of routine network management tasks, Know the reasons for keeping a log of work completed on a network, Carry out and document a range of different routine network management tasks.
3
Routine Network Management Tasks Network administrators carry out a range of different tasks on a daily basis to keep the network operational – These daily tasks are known as “Routine Network Management Tasks” They fall into a number of categories including: User Accounting Development of login scripts Maintaining Security Storage Maintenance Backups For P6 you need to carry out and evidence a number of different routine network management tasks.
4
Specific Examples of Routine Network Management Tasks Some network management activities which you can carry out include: Backup and restoring files, User account creation and deletion, Design and develop login scripts, Virus scanning, File cleanup, Configuring user accounts, Setting drive mappings, Configuring virus scan options
5
Need For Documentation Any changes made to a network should be documented so that if a fault occurs the changes can be rolled back, When carrying out practical tasks for M3 you need to log all the tasks which you complete, Producing a table will allow you to log the changes to the network you make and provide suitable evidence for M3 Your table should include columns for: Activity Date / Time, Accurate technical details of the tools and devices you used Any appropriate comments on the tasks. ActivityDate / TimeEquipment and Software UsedComments
6
Example Documentation ActivityDate / TimeEquipment and Software Used Comments Creating modem telephone cable 21-01-2013 Telephone cable (twin pair) RJ11 Crimping tool RJ11 Connectors * 2 RJ11 cable tester Wiring diagram Cut about 25mm of outer, ensure pairs are untwisted and straight - cut down to 10mm place in the connector in correct order (use wiring diagram) and crimp….. Tasks done so far which you can document: Creating Ethernet cable Creating coax network cable Installing and scheduling antivirus software Over the next few sessions you will carry out further routine network management tasks – ensure you record all activities thoroughly in your log table
7
For P6, you should undertake as many as possible of the routine maintenance operations outlined in the unit content. Tasks must be from actual hands on experience and not just a written account of what you could do!!! For M3 you need to include formal logs of the tasks which you carry out. A word processed or spread sheet table which is either typed up or filled in by hand is appropriate. P6 - Undertake routine network management tasks M3 - Keep accurate records of network management tasks. P6 - Undertake routine network management tasks M3 - Keep accurate records of network management tasks.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.