Download presentation
Presentation is loading. Please wait.
Published byMaud Annabel Lawrence Modified over 9 years ago
1
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
2
Motivation to test equipment on site Exposure to LHC like radiation field Short turn around Pre selection of components facilitated Complete systems tests (crates) before installation RP issues
3
MC simulations ARC per Gy –1 x 10 8 to 1 x 10 10 n > 100 keV –2 x 10 8 to 4 x 10 9 n > 20 MeV –2 x 10 8 to 2 x 10 9 n > 100 MeV CNGS per Gy –1 x 10 10 n > 100 keV –5 x 10 9 n > 20 MeV Dose rates : CNGS : 1 to 150 Gy per week ARC-DS : 1 to 200 Gy per year
4
CNGS Radiation Test facility 5 x WorldFIP Cable –1 of which is for the RadMon installation 4 x Profibus Cable 8 x NE48 Cable –Cable request given to TS/EL (8 th Feb 2008) 2 x (6x monomode fibre optic tubes) –Request given to TS/EL/CF (12 th Feb 2008) 4 x SubD Cables 4 x Patch panel (test area) 1 x Rack (repeater station) 2 x Rack (Control room) Length of each cable is approx 1.2km (Around 28km in total)
5
Layout of facility Control room Area Signal repeater area Test area
6
Readout electronics in Bat 921-2001
7
Signal repeaters Signal repeater area
8
CNGS underground Location of Radmon dosimeters Radiation test area
9
CNGS – 17 October 2007 23 January 2008TS-LEA group meeting9 TS Radiation Monitors
10
Location of RadMon devices (1) (2)(3) (4)(5) (6)
11
Location Signal Patch Panels Patch Panel 1 Patch Panel 2 Patch Panel 3 Patch Panel 4
12
Signal Cables 4 Patch panels Per Panel –2 x WorldFIP (1 for RadMon) –1 x Profibus –2 x “Burndy” NE48 –1 x SubD 9 Connector –6 x fiber optic connections (Only on Patch panel 1 and 2) –2 x 3 phase power supply –1 x multi-socket single phase
13
Patch Panels
15
Miniracks
16
Candidate equipment for testing in 2008 LHC power converter electronics (RR’s & UJ76) QPS electronics
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.