Download presentation
Presentation is loading. Please wait.
Published byFerdinand Freeman Modified over 8 years ago
1
AEP IOP Suggestions Greg Steinmetz 11/11/2009
2
AEP's gridSMART Project - Implementation of CIM within Metering/AMI South Bend pilot 2 IOP Suggestions Include a state change in a recipient system of a command/control message – For example, issuance of a disconnect would show the meter disconnect Participation from a wider array of vendors and utilities – Would like to see major players involved
3
AEP's gridSMART Project - Implementation of CIM within Metering/AMI South Bend pilot 3 IOP Suggestions (Cont.) Would be valuable to understand the extensions that have been incorporated by the participating vendors Event Types 61968 Annex E – High Temperature Alarm – 2.35.1.93 – Low Battery Detected - 2.2.1.149 – Last Gasp – NIC has lost power – DC Detected & Low Potential
4
AEP's gridSMART Project - Implementation of CIM within Metering/AMI South Bend pilot 4 IOP Suggestions (Cont.) Event Types 61968-9 Annex E – Cover Removal Detected – 3.33.1.44 – Reverse Flow Detected – 3.33.1.219 Messages – Include MeterServiceRequests Future Testing – Versioning – communication of what was tested and model differences
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.