AAs in PEP Jan Geralt Bij de Vaate
2
PEP Project Execution Plan for the pre construction phase of the SKA Consortium to be formed AA-low ready for construction AA-mid part of the Advanced Instrumentation Program (AIP) 2012-2016
3
Allocation of Requirements from System to Element level Pre-Stage 1 System RR Element SRR 1 st allocation is science requirements, operations requirements (Instrument Requirements Review). Later allocations are extensibility requirements and non-functional requirements. System Level (SPDO/SPO) Element Level (WPCs) 1 2
4
Assembling Element Level RFPs for Stage 1 Work SoW Pre-Stage 1 Planning Element 1 CoDR-SRR Work Planning Element 2 CoDR-SRR Work Planning Element N CoDR-SRR Work RFP Bid Define Top-level WBS Develop Stage 1 Legal, Bid Policy, T&C Contract Templates Stage 1 Element MoAs Nov/11 Apr/12 Assemble Work Package Consortia review Jun/12
5
AA SoW writing team
6
AA SoW Draft WBS created SoW writing started Full draft by mid Jan.
7
AA Consortium AA-mid receptor AA-mid receptor System Engineering WP Mgt AA-low AA Consortium board
8
AA Consortium AA-mid receptor AA-mid receptor System Engineering WP Mgt AA-low Signal processing Verification systems Infrastructure System Design Front-end array
9
pre Consortium INAF Oxford University Manchester University Cambridge University Obs Paris (Nancay) / Univ. of Bordeaux ICRAR Raman Research Institute ASTRON –Aperture Array Design and Construction Consortium: AADC 2..?
10
Consortium Work package Consortium Industry Participating Orgs Work package Consortium Industry Participating Org Industry Participating Org Stage 1 ? Stage 2 ? -IP issues -Funding/budgets
11
Pre Consortium Telecons and meeting in Perth (Aug/Sept 2011) This Friday focus on AA-mid Meeting in Manchester during/after the SPO gathering –Second half of 30 th Jan- 3 rd Feb week Letter of Intend proposal drafted Composing the bid on AA work package April/May 2012 Start 1 st July 2012
12
General AAVS Schedule AA-low Small array demonstratorsAAVS02011 Technology demonstrator AAVS12013 SKA1 full pre-production prototype arrayAAVS22015 SKA 1 manufacturing data package2016 AA-mid Individual tile demonstratorsAAVS02011 Single array performance demonstratorAAVS12013 Multi-array interferometer performance demonstratorAAVS22016 SKA 2 capable costed design2016
13
AA-low Demonstrators Array ScaleSitePurpose & Comments AAVS0 2011/2 AA-low16 elements Local Prove electromagnetic performance in small array. Multiple arrays AAVS1 2013/4 AA-low 256 elements Selected SKA site strongly preferred. Single station showing beam performance and the limits of analogue power requirements AAVS2 2015/6 AA-low,000’s of elements in single or multiple arrays Selected SKA site. Multiple stations, similar to AAVS1, to show imaging performance. Final proving for SKA 2. Small numbers of beams for processing reasons. NOT a science instrument AAVS2 science capable
14
AA-mid Demonstrators Array ScaleSitePurpose & Comments AAVS0 2011/2 AA-mid~1m 2 tile Test chambers/ EMBRACE For ORA: prove concept and LNA interface For Vivaldi: refine array and manufacturing techniques AAVS1 2013/4 AA-mid256 clusters Selected SKA site strongly preferred. Single station showing beam performance and the limits of analogue power requirements AAVS2 2015/6 AA-mid Single or array of stations Selected SKA site. Multiple stations, similar to AAVS1, to show imaging performance. Final proving for SKA 2. Small numbers of beams for processing reasons. NOT a science instrument AAVS2 science capable
15
Event list….. DateMilestone/EventRemarks Jan 2010AAVP start April 2011AA CoDR Aperture Array system, AA-low and AA-mid, Concept design review Nov. 2011AA dCoDRAperture Array delta concept design review of the AA-mid Q1 2012AAVS0 completion and testTesting of the various small array test systems April 2012AAVP final report for PrepSKAConsolidated findings from the PrepSKA work Q2 2012SKA site selection Q2 2012AAVS1 PRRProduction readiness for a small AAVS system Q3 2012Start AAVS1 constructionBuild AAVS1 on SKA site Q1 2013AA- SRRSKA 2 System Requirements Review for the AA-mid Q1 2013Start AAVS1 commissioningStart test and evaluation process Q2 2013AAVS2 PDR Q3 2013AAVS2 CDRCovers both AA-low and AA-mid..
16
AAVS Funding Self funded by the AA consortium Material AAVS 1 : 1M€ Material AAVS 2 : 5M€ –PEP numbers..
17
Notes A site decision delay impacts AAVS1/2 SKA site needs to be ‘happy’ to host AA Verification Systems Significant step needed from pathfinders to SKA 1 –Tight schedule Connect to deliverables of STaN, Computing and Software? Interference with pre-cursors? Need to tackle outstanding issues with existing team up to 1 st July 2012 –AAVS0 design, build and evaluation, AA-station specification/design