Download presentation
Presentation is loading. Please wait.
Published byNancy Randall Modified over 8 years ago
1
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects CALIFORNIA CHILDRENS SERVICES (CCS) OVERVIEW AND RELOCATION (3/13/12)
2
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects OVERVIEW California Children’s Services is a County run program that provides diagnostic and treatment services, medical case management, and physical and occupational therapy services to children under age 21 with CCS-eligible medical conditions. The CCS program that provides services for the West Contra Costa Unified School District is currently located on the closed Castro Elementary School campus. The current schedule for the conversion of Castro Elementary into the Portola Middle School campus indicates that construction will begin in the Summer of 2012.
3
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects CURRENT LOCATION
4
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects CURRENT LOCATION
5
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects CURRENT LOCATION
6
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects RELOCATION CRITERIA 3,000 square feet with access to water and some larger open interior spaces Active campus: Ideally where a significant number of children served by the Medical Therapy Program attend school Centrally located to the District Access to public transportation
7
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects PLAN DEVELOPMENT Downer Co-location with the Gompers School Independent access Infrastructure is existing for Ford temp campus Design Process Met with CCS staff Visit to Turner facility in Antioch Design meetings
8
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects SITE PLAN
9
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects FLOOR PLAN
10
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects SCHEDULE Portola at Castro Permit: Acquired Bid: May 2012 Construction Start: August 2012 CCS Relocation to Downer Permit: Expect 3/19/12 Bid: March/April Construction: April-June
11
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects QUESTIONS
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.