Download presentation
Presentation is loading. Please wait.
Published byBridget Stokes Modified over 8 years ago
1
1 Performance Management Presentation Provide Basic Animal Life Support Team Members: Eileen Morgan, Dr. Charmaine Foltz, Eric Hutchinson, Dennis Barnard, Andy Smith, Alphie Cisar, Brent Morse, Wayne O'Brien, Matt Tenace ORS National Institutes of Health 8 January, 2004
2
2 Table of Contents Main Presentation Performance Management Plan Customer Perspective C1a: AAALAC accreditation ratings C1b:ACUC inspection ratings by type C2c: Percentage of non-exempt animal census requiring socialization C2d:Percentage of attempted socializations that were successful C3a: ORS Customer Scorecard ratings for animal husbandry and clinical veterinary and technical services C3b: ORS Customer Scorecard Ratings for overall DVR services Internal Business Process Perspective IB1a: Investigator response time to notifications of health status IB1b: Percentage of holding agreements processed by beginning of fiscal year IB1c: Average number of days to receive quality assurance test results on feed
3
3 Table of Contents (cont.) Main Presentation Learning and Growth Perspective LG1a: Percentage of staff with desired credentials LG2b: Percentage of facilities with one fully trained technician Financial Perspective F1a: Unit cost of animal husbandry services F1b:Unit cost of clinical veterinary and technical services F1c:Unit cost of special environmental factors services F2a: Overall percentage of available housing utilized F2b: Overall percentage increase in holding capacity F3a: Percentage dollar savings associated with caging purchase strategy change Conclusions Appendix
4
4 Performance Management Plan
5
5 Relationship Among Performance Objectives --- relationship between objectives in different perspectives ___ relationship between objectives within a perspective most important objectives
6
6 Customer Perspective
7
7
8
8 C1a: AAALAC Accreditation Ratings FY02 fully accredited with commendations for DVR FY99 fully accredited FY93 all of NIH fully accredited; DVR falls under that accreditation DVR continuously accredited since 1960s Note: AAALAC site visits are tri-annual 1960sFY02FY99 FY93
9
9 C1b: ACUC Inspection Results by Type (FY04 Q1) Note: Minor requests are not necessarily deficiencies, but rather suggestions.
10
10 Customer Perspective (cont.)
11
11 C2c: Percentage of Non-Exempt Animal Census Requiring Socialization (as of 30 Sept) FY03 50% of the non-exempt animal census required socialization FY02 46% of the non-exempt animal census required socialization Number of Animals
12
12 C2d: Percentage of Attempted Socializations That Were Successful (as of 30 Sept) FY03 84% of the attempted socializations were successful FY02 90% of the attempted socializations were successful Number of Animals
13
13 Customer Perspective (cont.)
14
14 Customer Scorecard Methodology In FY03, modified ORS Customer Scorecard for animal husbandry and clinical veterinary and technical services E-mail to customers (Animal Program Directors) in FY04 In FY03, modified ORS Customer Scorecard for overall DVR services Conduct structured interviews in FY04
15
15 C3a: Customer Scorecard Ratings for Animal Husbandry and Clinical Veterinary and Technical Services Conduct survey during Quarter 3 of FY04 Compare results to those obtained in FY02 Determine actions as appropriate
16
16 C3b: Customer Scorecard Ratings for Overall DVR Services Conduct structured interview and survey during Quarter 3 of FY04 Review baseline results Determine actions as appropriate
17
17 Customer Perspective Summary AAALAC Accreditation successful for DVR and included commendations ACUC ratings included 30 commendations, 30 minor requests, and 12 major deficiencies Attempted socializations of non-human primates increased from 46% to 50% in FY03 84% of the attempted socializations were successful Customer interviews and surveys to be completed in FY04
18
18 Customer Perspective Planned Actions ACUC semi-annual reviews of program and facilities ongoing; Strive to minimize major deficiencies Maintain percentages of attempted and successful socializations for non-human primates Customer surveys to be sent to Animal Program Directors and structured interviews conducted with Scientific Directors in third quarter FY04
19
19 Internal Business Process Perspective
20
20 Internal Business Process Perspective
21
21 IB1a: Investigator Response Time to Notifications of Health Status (as of 30 Sep) Note: Data gathered from building 10A
22
22 IB1b: Percentage of Holding Agreements Processed by Beginning of Fiscal Year (as of 30 Sept) Note: Zero percentage of holding agreements were processed by beginning of fiscal year in FY03
23
23 IB1c: Average Number of Days to Receive Quality Assurance Test Results on Feed (as of 30 Sept) Note: Control chart 1B1c1 shown in Appendix FY03Average =15 days Range = 7 - 32 days FY02Average = 45 days Range = days
24
24 Internal Business Process Perspective Summary Investigator response time improvement continues at expected levels Holding agreements processing resulted in 100% improvement in FY03 Analysis of feed average turn-around time significantly improved from 45 days in FY02 to 15 days in FY03. However, a wide range still exists (7 – 32 days)
25
25 Internal Business Process Perspective Planned Actions Discontinue tracking of response time; electronic alternative to customers still requesting fax Holding agreement time frame process will continue to be measured to ensure maintenance of 100% success The nutrition program is undergoing review and we will be assessing status
26
26 Learning and Growth Perspective
27
27 Learning and Growth Perspective
28
28 LG1a: Percentage of Staff with Desired Credentials (as of FY04 Q1)
29
29 Learning and Growth Perspective (cont.)
30
30 LG2b: Percentage of Facilities with One Fully Trained Technician (as of FY04Q1) Based on pilot test of 3 facilities 100% of the pilot facilities had one fully trained technician Will gather data on all facilities in FY04 and track semi-annually
31
31 Learning and Growth Perspective Summary Staff accreditations Locating and retaining veterinarians with ACLAM board certification challenging Facility managers maintained AALAS LATG Accreditation Status Pilot of Fully Trained Technicians successful
32
32 Learning and Growth Perspective Planned Actions Accreditations Strive to obtain and retain board certified veterinarians in all new hires Encourage facility management personnel to obtain LATG certification
33
33 Financial Perspective
34
34 Financial Perspective
35
35 F1a: Animal Husbandry Unit Cost (as of 30 Sep) Note: Baseline Unit Cost
36
36 F1b: Clinical Veterinary and Technical Services Unit Cost (as of 30 Sep) Note: Baseline Unit Cost
37
37 F1c: Special Environmental Factors Unit Cost (as of 30 Sep) Note: Baseline Unit Cost
38
38 Financial Perspective (cont)
39
39 F2a: Overall Percentage Increase in Available Housing Utilized (as of 30 Sep) Note: Includes all housing available for all animals. Individual building and animal percentages are presented in separate graphs in the Appendix.
40
40 F2b: Overall Percentage Increase in Holding Capacity (as of 30 Sep) Note: Includes entire holding capacity available for all animals. Individual building and animal percentages are presented in separate graphs in the Appendix.
41
41 Financial Perspective (cont)
42
42 F3a: Percentage Dollar Savings in Caging Purchases (as of 30 Sep) In FY02, identified bulk purchasing as potential improvement to streamline purchasing process
43
43 Financial Perspective Summary Unit Cost Animal Husbandry Unit Cost is $1.83/animal cage days Veterinary and Technical Unit Cost is $10.33/animal census Special Environmental Factors combined are $90/unit Housing Utilized and Holding Capacity continue to increase across DVR Bulk purchasing of caging resulted in 23% percent savings to DRV in FY03
44
44 Financial Perspective Planned Actions Unit Costs will continue to be calculated in future FY’s for cost containment purposes Housing Utilized Increases in leasing agreements continues Housing Capacities continue to grow Use of new caging schemes, i.e., ventilated rodent racks Renovation of areas to become animal holding, i.e., Building 14G, 106; Building 102, A wing.
45
45 Financial Perspective Planned Actions Savings in Caging Purchases Continue to purchase bulk caging to obtain best pricing Purchase rodent enrichment in bulk to reduce unit pricing
46
46 Conclusions
47
47 Conclusions from PMP Full AAALAC Accreditation was maintained Socializations maintained at satisfactory level Established a baseline for monitoring ACUC Established a baseline for monitoring commendations and complaints Investigator Response Time improvement consistent over time Addressed Leasing Agreement Process with a 100% improvement Nutrition Program is currently being evaluated in its entirety Identified a downward trend in Veterinary Certifications
48
48 Conclusions from PMP Technician Proficiencies completed as a Pilot In 3 facilities, identified a minimum of one fully trained technician Housing Utilized and Capacity Continue to be innovative in use of animal housing space utilizing new technology and transforming space to meet demand for housing different species, i.e., 102 housing rodents and primates
49
49 Conclusions from PMP Highlight initiatives for FY04 Strengthen animal care and use program for upcoming AAALAC review to include revision of SOP’s Strive to increase socializations by 5-10% Complete nutrition program review Complete customer surveys for scientific directors Complete technician proficiencies for each veterinary technician; strive for increased percentage of fully trained technicians
50
50 Appendix Pages 2 – 9 of Performance Management Plan Customer Perspective C1c: ACUC inspection ratings by facility C1d: ACUC inspection ratings by discrete service C2a: For control special environmental factors, number of consultations, presentations and trainings C2b: For control special environmental factors, number of publications and abstracts C3c: Number of commendations, minor requests/complaints, and major defects by type C3d: Number of commendations, minor requests/complaints, and major defects by facility C3e:Number of commendations, minor requests/complaints, and major defects by discrete service
51
51 Appendix (cont.) Appendix Internal Business Process Perspective IB1c1: Control chart analysis of feed quality test assurance results turnaround time by month Learning and Growth Perspective LG2a: Percentage of technicians fully trained on all procedures by facility
52
52 Appendix (cont.) Appendix Financial Perspective F2c:Percentage increase in holding capacity and housing utilized for building 10A rodents F2d: Percentage increase in holding capacity and housing utilized for building 14B rodents F2e: Percentage increase in holding capacity and housing utilized for building 14C rodents F2f: Percentage increase in housing utilized for building 14B non- human primates F2g: Percentage increase in housing utilized for buildings 103 and 104 non-human primates
53
53 Performance Management Plan (page 2)
54
54 Performance Management Plan (page 3)
55
55 Performance Management Plan (page 4)
56
56 Performance Management Plan (page 5)
57
57 Performance Management Plan (page 6)
58
58 Performance Management Plan (page 7)
59
59 Performance Management Plan (page 8)
60
60 Performance Management Plan (page 9)
61
61 Customer Perspective
62
62 C1c: ACUC Inspection Ratings by Facility (as of 30 Sep) Developed log in FY03 Will pilot test, revise, and implement in FY04
63
63 Customer Perspective (cont.)
64
64 C2a: Number of Consultations, Presentations and Trainings (as of 30 Sep) Note: Includes Control Special Environmental Factors data
65
65 C2b: Number of Publications and Abstracts/Posters (as of 30 Sep) Note: Includes Control Special Environmental Factors data
66
66 Customer Perspective (cont.)
67
67 C3c: Customer Feedback Categorization by Type (as of FY04Q1) Developed customer log of commendations and complaints Will pilot test and revise in FY04
68
68 C3d: Customer Feedback Categorization by Facility (as of FY04Q1) Developed customer log of commendations and complaints Will pilot test and revise in FY04
69
69 C3e: Customer Feedback Categorization by Discrete Service (as of FY04Q1) Developed customer log of commendations and complaints Will pilot test and revise in FY04
70
70 Internal Business Process Perspective
71
71 IB1C1: Average Turnaround Time for Feed Quality Assurance Results (as of 30 Sep)
72
72 Learning and Growth Perspective
73
73 LG2a: Percentage of Technicians Fully Trained on all Procedures by Facility (as of 30 Sep) Data not available in FY03 Will begin collecting this data in FY04
74
74 Financial Perspective
75
75 F2c: Percentage Increase in Holding Capacity and Housing Utilized for Building 10A Rodents (as of 30 Sep) Note: Percentage increase shown is against FY99 baseline
76
76 F2d: Percentage Increase in Holding Capacity and Housing Utilized for Building 14B Rodents (as of 30 Sep) Note: Percentage increase shown is against FY01 baseline
77
77 F2e: Percentage Increase in Holding Capacity and Housing Utilized for Building 14C Rodents (as of 30 Sep) Note: Percentage increase/decrease shown is against FY01 baseline FY02FY03
78
78 F2f: Percentage Increase in Housing Utilized for Building 14B Non-Human Primates (as of 30 Sep) Note: Percentage increase shown is against FY01 baseline
79
79 F2g: Percentage Increase in Housing Utilized for Buildings 103 and 104 Non- Human Primates (as of 30 Sep) Note: Percentage increase/decrease shown is against FY00 baseline FY01FY02FY03
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.