Physics of the Cosmos Program Analysis Group John Nousek Penn State University International Workshop on Astronomical X–Ray Optics Prague, Czech Republic 9 December 2014
2
2 Talk Overview Physics of the Cosmos Program AnalysisGroup (PhysPAG) *** Astrophysics Implementation Plan *** Near Term Strategy *** Potential US Contributions to Athena *** PhysPAG Support for Decadal 2020
3
Physics of the Cosmos (PCOS): Scientific and Technical Stewardship for future missions Provide scientific and technical stewardship for decadal-survey recommended missions within the framework of the Astrophysics Implementation Plan: Of the six highly-ranked large and medium space-based priorities in NWNH, THREE fall within the PCOS science program: LISA IXO Inflation Probe (medium-scale) NOTE: WFIRST is located within the Exoplanet Program and the science of dark energy is within PCOS Courtesy - Ann Hornschmeier
4
PhysPAG Charter PhysPAG is responsible for soliciting and coordinating community input in the development and execution of NASA’s Physics of the Cosmos (PCOS) Program PhysPAG serves as a community-based forum for analysis in support of PCOS objectives, architecture planning, and activity prioritization. PhysPAG formally presents findings of its analyses to NASA SMD through the NASA Advisory Council (NAC). The Chair of the PhysPAG is drawn from the membership of the NAC Astrophysics Subcommittee The PhysPAG Chair is assisted by an Executive Committee that supports planning and activities of the group
5
Astrophysics Imp. Plan – Starting Point: Decadal Survey (2010) New Worlds, New Horizons prioritized Large, Medium and Small Scale activities: PriorityActivityScience 1WFIRSTDark Energy; Exoplanets; IR Survey 2ExplorersRapid Response to Science Opportunities 3LISAOpen Grav. Wave Detection Window; Test GR 4IXOBlack Hole Accretion; Matter/Energy Life Cycles LARGE PriorityActivityScience 1New Worlds Tech.Preparation for Planet Imaging Mission (>2020) 2Inflation ProbeCosmic Microwave Background tech (>2020) MEDIUM
6
Near Term (2014 & 2015) Congress has not appropriated money for Astrophysics (incl JWST) Budget requested by President is $1.33B for FY14, $1.25B for FY15 Difference is ~$85M for SOFIA Both bills in Congress include SOFIA (but add differing amounts) Astrophysics priorities maintain: JWST fully funded for early FY19 launch (Oct2018?) New mission formulation costs in FY14/15 – WFIRST/AFTA New Explorers underway (TESS, NICER) + participation in Euclid etc Discussing contributions to ATHENA & L3 Gravitational Wave mission New Explorer opportunities: SMEX Dec 2014, EX 2017 Impacts include: Unless Congress authorizes more money SOFIA will be shelved
7
Budget Status (2015) Administration request is $607M for Astrophysics; $645M for JWST House bill includes: Recommendation is $680M for Astrophysics (an increase of $73M) and $645M for JWST Restores $5M reduction in Hubble operations Rejects SOFIA termination; appropriates $70M (an increase of $58M) Provides $30M (an increase of $15M) for EPO Senate bill includes: Recommendation is $750M for Astrophysics (an increase of $143M) and $645M for JWST Restores $23M reduction in Hubble operations Provides $56M for WFIRST (an increase of $42M) Rejects SOFIA termination; appropriates $87M (an increase of $75M) Provides $42M (an increase of $27M) for EPO Continuing Resolution through December 11, funds first 10 weeks of FY15 at same levels as FY14
10
Astrophysics Near-term Strategy Astrophysics Implementation Plan (CY2012) Astrophysics Roadmap (CY2013) ESA’s L2/L3 process Identified SDT studies: Versions of WFIRST (2012) Exoplanet probe(s) (2013) X-ray probe (2013 TBC) Spring 2015: CAA study of all SDT reports resulting in a NRC letter report Spring 2013: Continue AFTA study pending Administrator’s approval Spring 2014: Interim SDT reports to NASA and CAA Winter 2015: Final SDT reports to NASA and CAA; CATE on each
11
PhysPAG Preparation of 2020 Decadal Survey Current plan is to finish JWST (2019), then do next mission (presumably WFIRST/AFTA) JWST finishes 2000 plan, WFIRST finishes 2010 plan Successor mission is less clear than situation in either 2000 or 2010 Decadals PAGs called upon to identify candidate missions for priority in studies to prepare for next (i.e. 2020) Decadal Survey Studies will refine cost and risk estimates to provide sounder basis for judgements affecting 2020 conclusions