1 | INALA TECHNOLOGIES INSTALLATION TRAINING: ECS (EQUIPMENT COMMUNICATIONS SYSTEM) ECS (ETH/GPRS) COMMISSIONING VERSION 1.0.

Similar presentations


Presentation on theme: "1 | INALA TECHNOLOGIES INSTALLATION TRAINING: ECS (EQUIPMENT COMMUNICATIONS SYSTEM) ECS (ETH/GPRS) COMMISSIONING VERSION 1.0."— Presentation transcript:

1 1 | INALA TECHNOLOGIES INSTALLATION TRAINING: ECS (EQUIPMENT COMMUNICATIONS SYSTEM) ECS (ETH/GPRS) COMMISSIONING VERSION 1.0

2 2 | ECS-(ETH/GPRS) COMMISSIONING COMMISSIONING: ECS (ETH/GPRS) PROCEDURE

3 3 | ECS (ETH/GPRS) - COMMISSIONING SAM Training Setting up of the unit: Power unit on Connect using the “ECS2” ECT Set-up the communication ports for the devices you are connecting to it Set-up the Sever IP address and APN – Customer Dependent Click on “update unit” after making a change to save the configuration to the unit. Check that LED1 is on to indicate that it is logged onto GPRS and the APN - Customer Dependent. Call to commission site with representative. Port Settings SAM2 & Access Control RS484 = Physical port 1 – Virtual Port 301, Baud rate 9600 L&G and/or Deep Sea RS485 = Physical port 2 – Virtual Port 309, Baud rate 19200 SAM1.5 = Physical port 3 – Virtual Port 310, Baud rate 19200. Enable Flow Control Rectifier = Physical port 4 – Virtual port 302, Baud rate depends on type of Rectifier. Generator = Physical port 5 – Vittual port 304, Baud rate depends on type of Generator. *Note – Check following slide for detail information of above procedure LED Indications LED 1 on = GSM Network found and Logged onto GPRS ECS (Eth/GPRS) Communication Cable: A “USB Printer cable” must be used between the ECS(Eth/GPRS) and the computer. Once Connected open the “ECS2 ECT” software. Click on USB and Login

4 4 | ECS (ETH/GPRS) – PHYSICAL PORT NUMBERS SAM Training PORT 1 – RS485 PORT 2 – Isolated RS485 PORT 3 – RS232 PORT 4 – RS232 PORT 5 – RS232 PORT 6 – RS232 PORT 7 – RS232 * The physical port that is connected to the SAM or Access Control must be selected as the “UDP PORT” GND 48VDC Earth

5 5 | SOFTWARE FOR ECS (ETH/GPRS) (EQUIPMENT COMMUNICATION CONTROLLER) – USING SIM SAM Training Communication Controller Software (ECS2 ECT): ECT Version is viewed on the top left corner as indicated with the yellow circle EG: “ECS2 ECT V 1.4” Firmware Version is viewed on the bottom as indicated with the Red circle EG: “Build: 1.4” IP address is automatically allocated to sim card and is displayed. Enable: 1.GPRS Modem 2.Input APN name - Customer Dependent 3.Input Server IP and UDP port - Customer Dependent 4.Set Port configuration 5.Click on Update unit 6.Wait for unit to complete updating

6 6 | SOFTWARE FOR ECS (ETH/GPRS) (EQUIPMENT COMMUNICATION CONTROLLER) – NOT USING SIM SAM Training Communication Controller Software (ECS2 ECT): ECT Version is viewed on the top left corner as indicated with the yellow circle EG: “ECS2 ECT V 1.4” Firmware Version is viewed on the bottom as indicated with the Red circle EG: “Build: 1.4” IP address is must be inserted if no GPRS SIM card is being used 1.Insert IP, Mask & DG IP addresses 2.Input Server IP and UDP port - Customer Dependent 3.Set Port configuration 4.Click on Update unit 5.Wait for unit to complete updating

7 7 | EQUIPMENT COMMUNICATION CONTROLLER – PORT & SERVER ALLOCATIONS SAM Training Virtual Port Allocations 301 SAM2 or SAM3 and Access Control 302 Rectifier A 303 Rectifier B 304Generator 305 AVR 306 BMON 307Fuel Cell 1 308 Fuel Cell 2 309Energy Meter / Fire System 310 SAM 1.5 REC Vodacom Server NameVodacom UDP Server IPUDP Server Port ZABLV06101 - CEN10.121.5.165299 ZABLV06102 - EAS10.121.5.153299 ZABLV06103 - LIM10.121.5.154299 ZABLV06104 - MPU10.121.5.155299 ZABLV06105 - SGC10.121.5.156299 ZABLV06106 - SGS10.121.5.157299 ZABLV06107 - WES10.121.5.158299 NGA Existing Server 10.102.242.202299 Telkom Server NameTelkom UDP Server IPUDP Server Port 10.149.104.562999 Neotel Server NameNeotel UDP Server IPUDP Server Port 172.24.146.4299 Operator NameAPN Name VodacomVodameter Neotelinternet

8 8 | EQUIPMENT COMMUNICATION CONTROLLER – COMS WIRING SAM Training Communication Cable Consumables ECS (Eth/E1), ECS-L 1. 10 way Ribbon Cable 2. 10 way IDC connector for 10 way ribbon cable 3. DB9 IDC, male and female for 10 way ribbon cable ECS (Eth/GPRS), ECS (Eth/E1) & ECS-L 1. DB9, male and female, solder type 2. Milar cable used with point 1 above (Same as SAM2 Coms cross over cable) ECS (Eth/GPRS), ECS (Eth/E1) & ECS-L 1. RJ9 – small 4 way 2. RJ11 – large 4 way 3. RJ12 - 6 way 4. RJ45 – 8way 5. Cable for each above 6. CAT5 cable Possible Communication Cables needed 1. SAM1.5 2. SAM2, SAM3 & Access Control 3. Energy Meter (Landis & Gyrr) Rectifier 4. Rectifier (Battery Tech, Grintek, ASM, etc) 5. Generator (Lovato, Deep Sea, Intellilite, etc) 6. Fuel Cell (Idatech, Gencore, etc)

9 9 | ECS (ETH/GPRS) COMMUNICATION WIRING SAM2 & ACCESS CONTROL SAM Training

10 10 | ECS (ETH/GPRS) COMMUNICATION WIRING SAM1.5 SAM Training

11 11 | ECS (ETH/GPRS) COMMUNICATION WIRING LANDIS & GYRR SAM Training

12 12 | ECS (ETH/GPRS) COMMUNICATION WIRING BATTERY TECH SM65 SAM Training

13 13 | ECS (ETH/GPRS) COMMUNICATION WIRING BATTERY TECH SC200 SAM Training SC200 LAN CONNECTION SC200 RS232 CONNECTION FRONT VIEW REAR VIEW

14 14 | ECS (ETH/GPRS) COMMUNICATION WIRING BATTERY TECH SM50 SAM Training

15 15 | ECS (ETH/GPRS) COMMUNICATION WIRING GRINTEK GT500 SAM Training

16 16 | ECS (ETH/GPRS) COMMUNICATION WIRING DEEP SEA SAM Training

17 17 | ECS (ETH/GPRS) COMMUNICATION WIRING LOVATO SAM Training

18 18 | CLICK TO EDIT MASTER TITLE STYLE THANK YOU