Download presentation
Presentation is loading. Please wait.
Published byEllen Newton Modified over 9 years ago
1
Kappa Group Meeting - September 20091 BL13 — XALOC Guifré Cuní Jordi Juanhuix on behalf of the XALOC team
2
Kappa Group Meeting - September 20092 BL13 Current Status Lead hutches: installed Electrical power, fluids and cable trays: installed Personal safety system: installed OH Remaining optics End 2009 Beamline commissioning: End 2010 EH Undulator: Sep 2010 End station elements: Beginning 2010 Monochromator and mirrors: installed BL13-XALOC – Status
3
Kappa Group Meeting - September 20093 Detector Status: Deadline CFT 15 Sep Diffractometer Status: DDR approved Delivery: Jan 2010 Beam conditioning el’s Status: Designing Diffractometer table Status: Manufacturing Delivery: Jan 2010 Sample changer Status: DDR Delivery: Jan 2010 Detector table Status: Manufacturing Delivery: Jan 2010 in-house commercial mixed BL13-XALOC – Status End Station
4
Kappa Group Meeting - September 20094 ISPyB Laboratory Information Management System mxCuBE GUI Experiment Management EDNA On Line data Analysis Edna project ESRF ESRF/spine eHTPX mxCuBE Framework 4 Control objects ALBA implementation Pool and Macroserver ALBAESRF Device Servers Control objects ESRF implementation Spec Device Servers BL13-XALOC – Control arquitecture ? STAC
5
Kappa Group Meeting - September 20095 Optics: Standard TAU widgets Macros (monitoring, alignment, etc) End Station: –Special Device Servers Automatic Sample Changer (CATS-Irelec-FIP) Diffractometer MD2M (Maatel-Bruker-EMBL) ?? –Spec Macros Monitoring, alignment, data collection, etc Implement Macros in our MacroServer –mxCuBE (Bliss Framework 4) Adapt and extend to our experiment requirements in collaboration with the ESRF BL13-XALOC – Status of BL Control
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.