2 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 2 Simulation Exercise Project 2  Request for Proposal – read handout 4.0 RFP number as example xx-06-RFP-DETEC-TSTM-XXXX  High energy laser target surface temperature measurement capability Directed Energy Test and Evaluation Capability (DETEC)

3 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 3 Background: DETEC Programs Fulfill a National T&E Infrastructure Requirement  The Central Test and Evaluation Investment Program (CTEIP) funds the Directed Energy Test and Evaluation Capability (DETEC) project tri-service study To identify, scope and prioritize shortfalls in the test and evaluation (T&E) infrastructure needed for testing joint service directed energy (DE) weapons systems To develop enhanced capability to test next-generation directed energy weapon systems  The High Energy Laser (HEL) Target Surface Temperature Measurement (TSTM) capability addresses one of these critical shortfalls Measure temperatures non-intrusively on a target’s surface when hit by a laser – extreme technical challenges to solve due to nature and physics of the problem Build and test and demonstrate a prototype in 18 months Manufacture a number (12) articles in a couple of years

4 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 4 Simulation Exercise Project 2: HEL TSTM  A real RFP and program bid by ARA Complexity of project is representative of programs that ARA must win in the future to stay competitive and grow Dollar value $2M-$4M+ over first two years – more in out-years  Customer required use of various Management Best Practices, specifically: Detailed Work Breakdown Structure, Integrated Master Plan, Integrated Master Schedules, etc. Earned Value Management Research and Development plus build prototype A Systems Engineering approach ▪System Requirements Review ▪Preliminary Design Review ▪Critical Design Review ▪Test Readiness Review, etc. More customers requiring Best Practices in the Management Approach

5 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 5 Simulation Exercise – Handouts Solicitation Documents  Must read to do the exercise Proposal instructions to offerors (RFP) Evaluation criteria and standards (RFP) Statement of work (RFP)  Background info only provided in handouts (scan) Performance specification Risk management analysis Concept of operations Must read before tomorrow!

6 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 6 Simulation Exercise Project 2: History  ARA Proposal Manager and the designated Program Manger: Sharp engineer with previous ARA PI experience BUT, no experience in Management Approach requiring: ▪WBS, IMP, IMS ▪EVMS and CDRL Format 1 and 2 Program Control reporting ▪Large Cost Proposal “bottoms up” build-up ▪Systems Engineering approach as part of management approach  A competitive Technical Approach and solution proposed One of the goals for ARA PM course: Prepare ARA’s PMs to design, organize and execute a complex project and NOT have to experience what this PI went through

7 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 7 Simulation Exercise (SE) 2 DLOs  Teams will design the program structure Create the Work Breakdown Structure (SE 2a) Design the Team Organizational structure (SE 2b)  Teams will design the Plan and the Schedule Build the Integrated Master Plan (IMP) (SE 2c) Build the Integrated Master Schedule (IMS) (SE 2d)

8 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 8 Assignment of Teams  Team 1 Jennifer Albertson (PM for SE 2a) Sarah Gray (PM for SE 2b) Matthew Janisz (PM for SE 2c – IMP) Clayton Tinsley (PM for SE 2d – IMS)  Team 2 Juan Archilla (PM for SE 2a) James A. Gravelin (PM for SE 2b) John Markey (PM for SE 2c – IMP) Ed Sears (PM for SE 2d – IMS)  Team 3 Suzanne Bates (PM for SE 2a) Paul J. Edwardson (PM for SE 2b) Thomas Moser (PM for SE 2d – IMP & IMS)  Team 4 LeeAnn Bongiorno (PM for SE 2a) Rob Phillips (PM for SE 2b) Rob Karl (PM for SE 2c/d – IMP & IMS)

9 Copyright 2009. All rights reserved. Applied Research Associates, Inc. 9 Summary  Through realistic Simulated Case Studies, you will be better prepared for a PM role on any project, whether small, mid-size or large, and on more complex projects using best practices and principles that customers expect.  Opportunity for team-building and to practice leadership skills needed to run a motivated team