CONSTRUCTION PROJECTS DELAY
3
Attitude of Contractor and CompanyAttitude of Contractor and Company Agreement between Contractors and consultantsAgreement between Contractors and consultants Design changes, poor labour productivity and inadequate planningDesign changes, poor labour productivity and inadequate planning
4
Effect of construction projects delay Time and cost overrunsTime and cost overruns Misunderstanding will occur between the client and contractorMisunderstanding will occur between the client and contractor A bad impression to clientsA bad impression to clients
5
How to Solve?? A Programme or Project Evaluation & Review Technique (PERT)A Programme or Project Evaluation & Review Technique (PERT) Multi-agent SystemMulti-agent System Visual 4D planning and scheduling techniquesVisual 4D planning and scheduling techniques
7
To identify the factors contributing to the delay in constructionsTo identify the factors contributing to the delay in constructions To identify the main effects on owner as a result of the delayTo identify the main effects on owner as a result of the delay
8
Research Questions…… Distribute the questionnaire among civil engineering students, academic and non- academic staff. 30 samples 20 undergraduates students and 10 academic and non-academic staffs. Analyse the result by using graph and chart.
9
Data analysis
10
Highest Frequency : Poor Scheduling Second : Stoppages Third :Lack of equipment Less : Stop work orders and Inspection delays
11
The highest frequency is incidences. Material shortage, delays in material deliveries and delays due to interference with other crews shared same frequency. Lowest frequency is site access.
12
The highest choose by respondents is management factors Followed by economy factors. Third is environmental factors Fourth is manpower factors. Lowest is site factors.
13
Highest percentage : Financial problem Second : Increase interest Third : Additional Professional Fees Lowest : Loss of use
14
Highest percentage :Loss of trustworthy (47%) Second :Loss of productivity(27%) Disruption of building and bad signal to the foreign investors shared same percentage (13%). same percentage (13%).
16
Our research conducted about construction projects delay which contribute to causes and factors. There are some of the solutions to improve the construction delay. Parties such as engineers, clients and contractors should count heavenly when a construction project to be delayed.