CSULB EE400D DOCUMENTATION INSTRUCTIONAL SERIES PRELIMINARY DESIGN REVIEW
2
The Preliminary Design proceeds from a clear definition of the Mission Objective(s) and Profile Program/Project Level 1 Requirements/Verification System/Subsystem Level 2 Requirements/Verification This material was codified in the Preliminary Design / Project Planning Blog Post. The Preliminary Design Review presents how your design has proceeded to date with the goal of meeting these objectives and requirements.
3
PRELIMINARY DESIGN REVIEW GUIDELINES Power Point Presentation 40 minute maximum duration Each person in the group should present their own work. Be familiar with the material, do not reed it from the overhead or from a sheet of paper Speak clearly, with authority, and eloquently Practice the presentation to ensure all topics are covered in the time allotted. Have simple and uncluttered visual materials. Do not put too much information on one visual. Plagiarism – Provide source for all visuals, text, block diagrams, etc.
4
PDR OUTLINE Title Page with WBSProject Manager Mission Objectives/ProfileProject Manager Requirements and Verification Program/ProjectProject Manager System/Subsystem System, Subsystem Engineers Design InnovationProject Manager Systems/Subsystem DesignSystem Engineer Electronic System Design System Block Diagram(s) Interface Definitions Mechanical System Design System Resource Reports Mass Budget Power Budget Design and Unique Task Descriptions Subsystem Engineers The Design Process: sketches, back of the envelope, trade-off studies, models… Summary Schedule and CostProject Manager Appendix: Sources
5
TITLE PAGE Team Member Names Division Assignments
6
SIMPLE ROBOT WORK BREAKDOWN STRUCTURE (WBS)
7
CLEARLY STATE MISSION OBJECTIVES AND MISSION PROFILE
8
LEVEL 1& 2 REQUIREMENTS REQUIREMENT EVALUATION RUBRIC 1. Is the requirement, Quantitative, Verifiable, and Realizable 2. Is the requirement located at the correct level (1 – Program/Project or 2 – System/Subsystem) 3. Is the requirement response to a higher level requirement or customer’s objective? Is the linkage clearly defined? Is requirement consistent with other requirements? 4. Does requirement provide links to source material? 5. Are equations used to calculate a requirement provided and are answers correct? 6. Is language in the form of a requirement? 7. Is a single requirement defined (i.e., breakup statements that contain multiple requirements)
9
LEVEL 1 REQUIREMENTS WITH VERIFICATION
10
LEVEL 2 REQUIREMENTS WITH VERIFICATION
11
SYSTEM AND SUBSYSTEM DESIGN BLOCK DIAGRAM
12
INTERFACE DEFINITION DESIGN EXAMPLES Your system interface includes your interface matrix and schematic(s).
13
RESOURCE REPORTS Resources that are important to your project need to be tracked over the life of the project. UFO Ab-ducted, BiPed, Spider, – Power and Mass Rover, ATechTop – Power Cost must be managed by all projects Over the life of the project; as simulations and experiments are run, trade-off studies completed, models and prototypes built and tested, you will be able to finalize your design. Until then, there will always be uncertainty. This level of uncertainty is managed by allocating margins to project resources. This may be done at the system, subsystem, and/or component level.
14
DESIGN UNIQUE TASK DESCRIPTIONS THE DESIGN PROCESS Sketch of the Design Ideas Back of the Envelope Calculations Trade Off Studies Models Mathematical Computer Simulation Physical Models (Rapid Prototyping) Full-scale Prototypes Scale Models
15
TASK DESCRIPTIONS EXAMPLES
17
Rapid Prototyping Example
18
COST AND SCHEDULE Bill of Materials Schedule with tasks By person
19
COST AND SCHEDULE EXAMPLES
21
APPENDIX Sources for outside information.
22
APPENDIX EXAMPLES
23
SUMMARY Focus On Original work – what you have learned Demonstration of the Engineering Method – From Objectives to Design Demonstrations with real hardware Do Not Show Product Pages Copied Promotional Text No linkage to Requirements
24
RESOURCES Introduction to Engineering Design and Problem Solving http://www.csulb.edu/~hill/ee400d/UNCC%20Intro%20to%20Engr%20Design.pdf Design Synthesis http://www.olivenhain.com/files/docs/projects/Demo_Garden/Design_Synthesis.pdf Preliminary Designs http://www.csulb.edu/~hill/ee400d/Lectures/08_Preliminary%20Design.pdf PDR Outline Document http://www.csulb.edu/~hill/ee400d/Lectures/10_PDR%20Presentation%20New%20for%20 F'14.pdf http://www.csulb.edu/~hill/ee400d/Lectures/10_PDR%20Presentation%20New%20for%20 F'14.pdf PDR Grading Criteria http://www.csulb.edu/~hill/ee400d/Lectures/10b_PDR%20Grading.pdf