Download presentation
Presentation is loading. Please wait.
Published byAngel Richard Modified over 9 years ago
1
CALEXICO HIGH SCHOOL MODERNIZATION / EXPANSION PROJECT STATUS REPORT # 1 Superintendent David Alvarez Board Members Gloria J. Rodriguez, President Jaime Duron, Vice President Dr. Reynaldo Ayala, Clerk Rita Huerta, Member Salvador Pacheco, Jr., Member JUNE 23, 2004
2
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATES ARCHITECTS SCHOOL SITE ANALAYSIS PHASE I STUDY (ESA Environmental Site Assessment) IN PROCESS Submitted to DTSC (Department of Toxic Substances Control) for review PHASE II STUDY (ESA Environmental Site Assessment) PENDING FOR DTSC RECOMMENDATION CEQA STUDY (California Environmental Quality Act) PENDING PROJECT STATUS REPORT SITE ENGINEERING STUDIES R.F.P. HAVE BEEN REQUESTED: TOPOGRAPHICAL MAP GEOLOGICAL STUDY DSA INSPECTOR LABOR COMPLIANCE PROGRAM
3
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATES ARCHITECTS PROJECT SITE LOCATION SITE LOCATION
4
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATES ARCHITECTS EDUCATIONAL SPECIFICATIONS ARCHITECTS TO DEVELOP SPECIFICATIONS. ARCHITECTS HAVE HAD SEVERAL MEETINGS WITH INDIVIDUAL DEPARTMENTS: STUDENT FOCUS GROUP PARENTS AND COMMUNITY PRINCIPAL & TEACHERS COACHES DISTRICT ADMINISTRATIVE STAFF 1 ST DRAFT WILL BE SUBMITTED FOR REVIEW. EDUCATIONAL SPECIFICATIONS
5
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATES ARCHITECTS CDE GUIDELINES (EDUCATIONAL SPECIFICATIONS ) CDE GUIDELINES – (EDUCATIONAL SPECIFICATIONS) SITE RELATIONSHIPS VISUAL SECURITY STUDENT / STAFF CIRCULATION VEHICULAR CIRCULATION PARENT / BUS DROP OFF DEFINITION RECOMMENDED CLASSROOM SIZE RESTROOM AND DRINKING FOUNTAIN COUNT CEQA ISSUES GAS LINE ISSUES
6
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATES ARCHITECTS PRELIMINARY SITE PLAN LAYOUT
7
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATES ARCHITECTS PRELIMINARY CAMPUS VIEW
8
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATES ARCHITECTS PRELIMINARY MULTI-USE CENTER VIEW
9
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATES ARCHITECTS PRELIMINARY FUNCTIONS PROGRAM Multi-Use Center Multi-use space for sports, games, gathering, etc. Stage Serving Kitchen Administration Building Media Center Building Library Classrooms / Teaching Stations (42) New General Classrooms (28) Existing Classrooms to be modernized (7) Portables Science Laboratories (6) New Classrooms (4) Existing Classrooms to be modernized Special Education Classrooms (4) New Classrooms (1) Existing Classroom to be modernized Classrooms for Future Growth (500 Students) (18) New Classrooms Gymnasium Modernization #1 Gymnasium Modernization #2 Performing Arts Center – Joint Use Sports Facilities – Fields Restroom Facilities – Girls Restroom Facilities – Boys Restroom Facilities – Staff
10
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATES ARCHITECTS DESIGN PHASE BUDGETING GUIDELINES MULTI-USE CENTER$160 / sq. ft. KITCHEN (FOOD PREPARATION)$315 / sq. ft. KITCHEN (SERVING LINE)$180 / sq. ft. ADMINISTRATION$190 / sq. ft. LIBRARY$165 / sq. ft. SPECIALIZED CLASSROOMS$175 / sq. ft. REGULAR CLASSROOMS$160 / sq. ft. HALLWAYS & SUPPORT SPACES$130 / sq. ft. LUNCH SHELTERS$100 / sq. ft. RESTROOMSexterior$540 / sq. ft. interior$300 / sq. ft.
11
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATES ARCHITECTS MARKET DEVELOPMENTS SKY ROCKET COST OF COMMODITIES Steel-based products Lumber Petroleum-based products Labor Shortage SATURATED MARKET CONDITIONS ESCALATED WORKER’S COMPENSATION INSURANCE
12
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATES ARCHITECTS COST CONTAINMENT STRATEGIES Xeriscape landscape and site development Design efficient administration and library buildings Design efficient multi-use center Eliminate covered walkways between buildings Postpone gymnasium and shower / locker rooms Design efficient classroom building Use alternate project delivery method Use manufactured classroom buildings
13
CALEXICO USD – CALEXICO HIGH SCHOOL GARCIA & ASSOCIATES ARCHITECTS TENTATIVE OPSC SFP 50 FUNDING ELEGIBILITY CALCULATIONS POTENTIAL STATE FUNDING AT THE HIGH SCHOOL SITE: DESCRIPTIONSTUDENTS (GRANTS) TOTAL BUDGET LOCAL SHARE CURRENT MODERNIZATION918 (34 CR)$5,978,108$2,391,243 FUTURE MODERNIZATION (PORTABLES) 243 (9 CR)$1,582,440$632,976 NEW CONSTRUCTION1,111 (41 CR)$18,865,447$9,432,723 TWO-STORY BUILDINGS1,111 (15%)$2,829,817$1,414,909 FACILITY HARDSHIP(12 CR, 17409 SQ. FT.)$4,058,038$2,029,019 TOTALS$33,313,850$15,900,870
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.