Download presentation
Presentation is loading. Please wait.
Published byNeal Crawford Modified over 9 years ago
1
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 1 Supplementary Slides for Software Engineering: A Practitioner's Approach, 6/e Part 4 Supplementary Slides for Software Engineering: A Practitioner's Approach, 6/e Part 4 copyright © 1996, 2001, 2005 R.S. Pressman & Associates, Inc. For University Use Only May be reproduced ONLY for student use at the university level when used in conjunction with Software Engineering: A Practitioner's Approach. Any other reproduction or use is expressly prohibited. This presentation, slides, or hardcopy may NOT be used for short courses, industry seminars, or consulting purposes.
2
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 2 Software Engineering: A Practitioner’s Approach, 6/e Chapter 21 Project Management Concepts Software Engineering: A Practitioner’s Approach, 6/e Chapter 21 Project Management Concepts copyright © 1996, 2001, 2005 R.S. Pressman & Associates, Inc. For University Use Only May be reproduced ONLY for student use at the university level when used in conjunction with Software Engineering: A Practitioner's Approach. Any other reproduction or use is expressly prohibited.
3
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 3 Overview Project management involves the planning, monitoring, and control of people, process, and events that occur during software development. Project management involves the planning, monitoring, and control of people, process, and events that occur during software development. Everyone manages, but the scope of each person's management activities varies according his or her role in the project. Everyone manages, but the scope of each person's management activities varies according his or her role in the project. Software needs to be managed because it is a complex, long duration undertaking. Software needs to be managed because it is a complex, long duration undertaking. Managers must focus on the fours P's to be successful (people, product, process, and project). Managers must focus on the fours P's to be successful (people, product, process, and project). A project plan is a document that defines the four P's in such a way as to ensure a cost effective, high quality software product. A project plan is a document that defines the four P's in such a way as to ensure a cost effective, high quality software product. The only way to be sure that a project plan worked correctly is by observing that a high quality product was delivered on time and under budget. The only way to be sure that a project plan worked correctly is by observing that a high quality product was delivered on time and under budget.
4
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 4 The 4 P’s People — the most important element of a successful project People — the most important element of a successful project recruiting, selection, performance management, training, compensation, career development, organization, work design, team/culture development recruiting, selection, performance management, training, compensation, career development, organization, work design, team/culture development Product — the software to be built Product — the software to be built product objectives, scope, alternative solutions, constraint tradeoffs product objectives, scope, alternative solutions, constraint tradeoffs Process — the set of framework activities and software engineering tasks to get the job done Process — the set of framework activities and software engineering tasks to get the job done milestones, work products, and QA points milestones, work products, and QA points Project — all work required to make the product a reality Project — all work required to make the product a reality planning, monitoring, controlling planning, monitoring, controlling
5
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 5 Stakeholders Senior managers who define the business issues that often have significant influence on the project. Senior managers who define the business issues that often have significant influence on the project. Project (technical) managers who must plan, motivate, organize, and control the practitioners who do software work. Project (technical) managers who must plan, motivate, organize, and control the practitioners who do software work. Practitioners who deliver the technical skills that are necessary to engineer a product or application. Practitioners who deliver the technical skills that are necessary to engineer a product or application. Customers who specify the requirements for the software to be engineered and other stakeholders who have a peripheral interest in the outcome. Customers who specify the requirements for the software to be engineered and other stakeholders who have a peripheral interest in the outcome. End-users who interact with the software once it is released for production use. End-users who interact with the software once it is released for production use.
6
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 6 Software Teams How to lead? How to organize? How to motivate? How to collaborate? How to create good ideas?
7
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 7 Team Leader The MOI Model The MOI Model Motivation. The ability to encourage (by “push or pull”) technical people to produce to their best ability. Motivation. The ability to encourage (by “push or pull”) technical people to produce to their best ability. Organization. The ability to mold existing processes (or invent new ones) that will enable the initial concept to be translated into a final product. Organization. The ability to mold existing processes (or invent new ones) that will enable the initial concept to be translated into a final product. Ideas or innovation. The ability to encourage people to create and feel creative even when they must work within bounds established for a particular software product or application. Ideas or innovation. The ability to encourage people to create and feel creative even when they must work within bounds established for a particular software product or application.
8
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 8 Software Teams the difficulty of the problem to be solved the difficulty of the problem to be solved the size of the resultant program(s) in lines of code or function points the size of the resultant program(s) in lines of code or function points the time that the team will stay together (team lifetime) the time that the team will stay together (team lifetime) the degree to which the problem can be modularized the degree to which the problem can be modularized the required quality and reliability of the system to be built the required quality and reliability of the system to be built the rigidity of the delivery date the rigidity of the delivery date the degree of sociability (communication) required for the project the degree of sociability (communication) required for the project The following factors must be considered when selecting a software project team structure...
9
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 9 closed paradigm—structures a team along a traditional hierarchy of authority closed paradigm—structures a team along a traditional hierarchy of authority random paradigm—structures a team loosely and depends on individual initiative of the team members random paradigm—structures a team loosely and depends on individual initiative of the team members open paradigm—attempts to structure a team in a manner that achieves some of the controls associated with the closed paradigm but also much of the innovation that occurs when using the random paradigm open paradigm—attempts to structure a team in a manner that achieves some of the controls associated with the closed paradigm but also much of the innovation that occurs when using the random paradigm synchronous paradigm—relies on the natural compartmentalization of a problem and organizes team members to work on pieces of the problem with little active communication among themselves synchronous paradigm—relies on the natural compartmentalization of a problem and organizes team members to work on pieces of the problem with little active communication among themselves Organizational Paradigms suggested by Constantine [CON93]
10
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 10 Avoid Team “Toxicity” Avoid Team “Toxicity” A frenzied work atmosphere in which team members waste energy and lose focus on the objectives of the work to be performed. High frustration caused by personal, business, or technological factors that cause friction among team members. “Fragmented or poorly coordinated procedures” or a poorly defined or improperly chosen process model that becomes a roadblock to accomplishment. Unclear definition of roles resulting in a lack of accountability and resultant finger-pointing. “Continuous and repeated exposure to failure” that leads to a loss of confidence and a lowering of morale.
11
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 11 Avoiding Team “Toxicity” in KMD Avoiding Team “Toxicity” in KMD Myers Briggs Personality Types. There are four mutually exclusive pairs of Myers Briggs personality types. Extroverts vs. Introverts (EI) Sensing vs. Intuitive (SN) Thinking vs. Feeling (TF) Judgers vs. Perceivers (JP)
12
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 12 Agile Teams Team members must have trust in one another. Team members must have trust in one another. Team self-organizes as project proceeds to maximize contributions of each individual's talents Team self-organizes as project proceeds to maximize contributions of each individual's talents Mavericks may have to be excluded from the team, if team cohesiveness is to be maintained. Mavericks may have to be excluded from the team, if team cohesiveness is to be maintained. Team is “self-organizing” Team is “self-organizing” An adaptive team structure An adaptive team structure Uses elements of Constantine’s random, open, and synchronous paradigms Uses elements of Constantine’s random, open, and synchronous paradigms Significant autonomy Significant autonomy
13
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 13 Agile Teams Teams have significant autonomy to make their own project management and technical decisions Teams have significant autonomy to make their own project management and technical decisions Planning kept to minimum and is constrained only by business requirements and organizational standards Planning kept to minimum and is constrained only by business requirements and organizational standards May conduct daily (10 - 20 minute) meeting to synchronize and coordinate each day's work May conduct daily (10 - 20 minute) meeting to synchronize and coordinate each day's work What has been accomplished since the last meeting? What has been accomplished since the last meeting? What needs to be accomplished by the next meeting? What needs to be accomplished by the next meeting? How will each team member contribute to accomplishing what needs to be done? How will each team member contribute to accomplishing what needs to be done? What roadblocks exist that have to be overcome? What roadblocks exist that have to be overcome?
14
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 14 Team Coordination & Communication Formal, impersonal approaches include software engineering documents and work products (including source code), technical memos, project milestones, schedules, and project control tools (Chapter 23), change requests and related documentation, error tracking reports, and repository data (see Chapter 26). Formal, impersonal approaches include software engineering documents and work products (including source code), technical memos, project milestones, schedules, and project control tools (Chapter 23), change requests and related documentation, error tracking reports, and repository data (see Chapter 26). Formal, interpersonal procedures focus on quality assurance activities (Chapter 25) applied to software engineering work products. These include status review meetings and design and code inspections. Formal, interpersonal procedures focus on quality assurance activities (Chapter 25) applied to software engineering work products. These include status review meetings and design and code inspections. Informal, interpersonal procedures include group meetings for information dissemination and problem solving and “collocation of requirements and development staff.” Informal, interpersonal procedures include group meetings for information dissemination and problem solving and “collocation of requirements and development staff.” Electronic communication encompasses electronic mail, electronic bulletin boards, and by extension, video-based conferencing systems. Electronic communication encompasses electronic mail, electronic bulletin boards, and by extension, video-based conferencing systems. Interpersonal networking includes informal discussions with team members and those outside the project who may have experience or insight that can assist team members. Interpersonal networking includes informal discussions with team members and those outside the project who may have experience or insight that can assist team members.
15
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 15 The Product Scope Scope Scope Context. How does the software to be built fit into a larger system, product, or business context and what constraints are imposed as a result of the context? Information objectives. What customer-visible data objects (Chapter 8) are produced as output from the software? What data objects are required for input? Function and performance. What function does the software perform to transform input data into output? Are any special performance characteristics to be addressed? Software project scope must be unambiguous and understandable at the management and technical levels.
16
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 16 Problem Decomposition Sometimes called partitioning or problem elaboration Once scope is defined … It is decomposed into constituent functions It is decomposed into user-visible data objects or It is decomposed into a set of problem classes Decomposition process continues until all functions or problem classes have been defined
17
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 17 The Process Process model chosen must be appropriate for the: customers and developers, characteristics of the product, and project development environment Process model chosen must be appropriate for the: customers and developers, characteristics of the product, and project development environment Project planning begins with melding the product and the process Project planning begins with melding the product and the process Each function to be engineered must pass through the set of framework activities defined for a software organization Each function to be engineered must pass through the set of framework activities defined for a software organization Work tasks may vary but the common process framework (CPF) is invariant (project size does not change the CPF) Work tasks may vary but the common process framework (CPF) is invariant (project size does not change the CPF)
18
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 18 The Process Once a process framework has been established Once a process framework has been established Consider project characteristics Consider project characteristics Determine the degree of rigor required Determine the degree of rigor required Define a task set for each software engineering activity Define a task set for each software engineering activity Task set = Task set = Software engineering tasks Software engineering tasks Work products Work products Quality assurance points Quality assurance points Milestones Milestones
19
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 19 Melding the Problem and the Process
20
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 20 The Project Projects get into trouble when … Projects get into trouble when … Software people don’t understand their customer’s needs. Software people don’t understand their customer’s needs. The product scope is poorly defined. The product scope is poorly defined. Changes are managed poorly. Changes are managed poorly. The chosen technology changes. The chosen technology changes. Business needs change [or are ill-defined]. Business needs change [or are ill-defined]. Deadlines are unrealistic. Deadlines are unrealistic. Users are resistant. Users are resistant. Sponsorship is lost [or was never properly obtained]. Sponsorship is lost [or was never properly obtained]. The project team lacks people with appropriate skills. The project team lacks people with appropriate skills. Managers [and practitioners] avoid best practices and lessons learned. Managers [and practitioners] avoid best practices and lessons learned.
21
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 21 Common-Sense Approach to Projects Start on the right foot. This is accomplished by working hard (very hard) to understand the problem that is to be solved and then setting realistic objectives and expectations. Start on the right foot. This is accomplished by working hard (very hard) to understand the problem that is to be solved and then setting realistic objectives and expectations. Maintain momentum. The project manager must provide incentives to keep turnover of personnel to an absolute minimum, the team should emphasize quality in every task it performs, and senior management should do everything possible to stay out of the team’s way. Maintain momentum. The project manager must provide incentives to keep turnover of personnel to an absolute minimum, the team should emphasize quality in every task it performs, and senior management should do everything possible to stay out of the team’s way. Track progress. For a software project, progress is tracked as work products (e.g., models, source code, sets of test cases) are produced and approved (using formal technical reviews) as part of a quality assurance activity. Track progress. For a software project, progress is tracked as work products (e.g., models, source code, sets of test cases) are produced and approved (using formal technical reviews) as part of a quality assurance activity. Make smart decisions. In essence, the decisions of the project manager and the software team should be to “keep it simple.” Make smart decisions. In essence, the decisions of the project manager and the software team should be to “keep it simple.” Conduct a postmortem analysis. Establish a consistent mechanism for extracting lessons learned for each project. Conduct a postmortem analysis. Establish a consistent mechanism for extracting lessons learned for each project.
22
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 22 To Get to the Essence of a Project Why is the system being developed? Why is the system being developed? What will be done? What will be done? When will it be accomplished? When will it be accomplished? Who is responsible? Who is responsible? Where are they organizationally located? Where are they organizationally located? How will the job be done technically and managerially? How will the job be done technically and managerially? How much of each resource (e.g., people, software, tools, database) will be needed? How much of each resource (e.g., people, software, tools, database) will be needed? Barry Boehm
23
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by R.S. Pressman & Associates, Inc., copyright © 1996, 2001, 2005 23 Critical Practices Formal risk management Formal risk management Empirical cost and schedule estimation Empirical cost and schedule estimation Metrics-based project management Metrics-based project management Earned value tracking Earned value tracking Defect tracking against quality targets Defect tracking against quality targets People aware project management People aware project management
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.