1 BAND-GEM Demonstrator Time Schedule Giuseppe Gorini

2 Task no. Deliverables Delivery Deadline / Delivery MS Task 1 D1 - Report on agreed requirements for demonstrator. March 2015 Task 2 D2 - Report on performance and measurement methods for demonstrator. June 2015 Task 3D3 - Design demonstrator for LOKI.September 2015 Task 4D4 – Critical design report (CDR).September 2015 Task 5D5 - Report on initial performance evaluation.March 2016 Task 6D6 - Report on cost engineering.December 2016 Task 7D7 - Technology performance demonstrator.December 2016 Task 8D8 - Delivery of demonstrator to the ESS.December 2016 Task 9D9 -Systems acceptance review (SAR).December 2016 Time Schedule – Deliverables – From Inkind Contract

3 Milestone (Primavera Id) Short description Planned/Baseline date LocationComment M1Kick-off meeting27 th Nov 2014MilanDone M2Progress meetings 16 th Mar 2015CERNDone M3CDRSeptember 2015Milan/Lund TBC Today? M4Joint demonstrator tests June 2016IFE TBC M5SARDecember 2016Milan TBC Time Schedule – Milestones – From Inkind Contract


Download ppt "BAND-GEM Demonstrator Time Schedule Giuseppe Gorini."

Similar presentations


Ads by Google