National Laboratory Operations Board Infrastructure Assessment Subgroup Real Property Background
Carmelo Melendez
2
Overview Taxonomy of F&I Assessments What is FIMS?
What are we reporting for Real Property? What are our External Stakeholder’s perceptions? Common Understandings
3
Taxonomy F&I Assessments Taxonomy
Capability – the potential or suitability of an asset(s) to meet mission requirements Functionality: the ability of an asset to perform a requirement as designed Availability: the time an asset is capable to meet an assigned mission Capacity: the designed amount an asset can contain or accommodate Utilization: the amount of an asset in actual use Condition - the physical state of an asset(s) Qualification & Acceptability: the level of sufficiency for an asset
4
What is FIMS? (Facilities Information Management System)
FIMS is NOT Existing Facility Information System Assessment Inventory system required for each agency by EO 13327, FRPC & OMB DOE’s corporate real property inventory system 41 CFR , Annual Real Property Inventories Real property inventory systems are used as part of other decision making tools to manage facility lifecycle actions and investments Current inventory is approximately 20,200 records 2.2 million acres of owned and withdrawn from public domain land $111B replacement plant value for owned buildings, trailers and structures 118M GSF of owned building and trailer space Currently consists of approximately 530 users; all data is input by site personnel Validations are performed annually by each site FIMS informational website:
5
FIMS Data Categories Status Occupancy Land Acreage Hazard Category
Mandated by OMB’s FRPC Maintenance Operating Cost Utilization Portion of an asset in use Summary Condition Excellent, Good, Adequate, Fair, Poor, Fail Sustainability Cool Roof Disposition Dimensions Replacement Plant Value Mission Dependency Critical, Dependent, Not Dependent Status Occupancy Land Acreage Hazard Category Usage Location Acquisition/Improvement Cost Leases/Outgrants GSA Owned/Leased Agency may add unique fields D
6
ORNL Bldg 7900 FIMS Standard Report #1
7
ORNL Top 25 ACI (Operating Buildings)
8
ORNL Lower 25 ACI (Operating Buildings)
9
FIMS BLUF/Take Aways FIMS is NOT an Existing Facility Information System Assessment FIMS is an Information Warehouse for DOE’s Real Property Data; Program & Site/Lab Operator owns Data FIMS is not a decision making tool for F&I Investments. Decision making tools/processes should acquire data from existing information sources like FIMS
10
What are we reporting for Real Property?
Reporting Quarterly to OMB & Yearly to GSA OGP OMB – Updates on: Disposition, Maintenance $, FIMS Data validation, Repair Needs (Def Maint) For FY-2013 FRPP – GSA OGP 10,500 Bldg ; 7,700 Struct; 2.2M acres; 118M sqft $111B Replacement Plant Value $5.4B Repair Needs $2.1B O&M 0.95 Asset Condition Index Individual Goals (Critical 0.97, Dependent 0.93, Non Dept 0.91)
11
Some External Stakeholders’ Perceptions?
“DOE is a high risk Agency for managing real property” GAO (Decision Making, Competing Interests, Excess Prop) “DOE requires stronger strategic planning capabilities and needs to know its current & future facility needs” NAPA Jan 2013 Report “DOE has a tenuous understanding of the relationship between mission and its assets” / “Agencies are unable to communicate facility investments to core mission outcomes” NRC 2004/2012 Reports “If we give you $25B every year, you have $100B in Real Property, and you are Mission Capable every year then why should we give you anything else?” -OMB Analysts
12
Common Understanding Goal: Present a consistent, accurate picture of current facility conditions and needs Establish a F&I Assessment Strategy Subgroup Objectives: To develop a facilities decision support system that: uses DOE-wide standards assesses Site/Lab conditions articulates Site/Lab and DOE needs estimates resource requirements assists in prioritizing mission programs and projects assists in allocation of resources with minimum impact on Site/Lab workloads Deliverables Inventory of Dedicated Mission F&I Assessment of Existing F&I Inventory for: Condition Capabilities Utilization An Analysis of the Assessment for: Investment Decision Making Based on Current Missions & Properties Investment Decision Making Based on Future Missions Strat Communications of Portfolio Req