Presentation is loading. Please wait.

Presentation is loading. Please wait.

Damon Ellender, Mars Homestead Project Programming Team

Similar presentations


Presentation on theme: "Damon Ellender, Mars Homestead Project Programming Team"— Presentation transcript:

1 Damon Ellender, Mars Homestead Project Programming Team
Requirements for Establishment of Site Data for a Permanent Mars Settlement Damon Ellender, Mars Homestead Project Programming Team

2 Outline The Mars Homestead Project Site Criteria and Selection Potential Settlement Sites Site Information Required

3 Mars Homestead Project
To Arrive, Survive, and Thrive TM Reactors Bulk Gas Plant Manufacturing Greenhouses Private Rooms Mining DRM Habs Interior Plan View

4 Site Criteria Located within kms of the Meridiani Expedition landing site Located near substantial subsurface aquifer Located within range of additional sites of scientific interest Located at low altitudes of -3 to -4 km below datum Minimal obstructions to local terrain Located near substantial mineral resources Located near the equator Located in hill or cliffline Located with reasonable range of spacecraft landing zone

5 Potential Settlement Sites
MHP Site #1 MHP Site #2 MHP Site #3 Opportunity Site Potential Settlement Sites

6 Site #1 Ares Valles (17.34°W, 4.09°N)
Copyright European Space Agency 2005 ©

7 Site #2 Arabia Terra (356.90°W, 2.14°N):

8 Site #3 Schiaparelli Crater (347.37°W, 2.90°S)

9 Site Information Required
Resource Identification, Sampling, and Recovery Location of Water Resources Detailed Mapping and Seismography Collection Confirmation of Atmospheric Composition Confirmation of Regolith Composition and Water Content Confirmation of Construction Methods “Cut and Fill” Process Other Experimentation Water Well Drilling and Proving Automated Greenhouse Brick and Concrete Manufacture Metal and Glass Extraction and Refining Methods

10 Location of Water Resources
Subsurface Aquifers Regolith Water Recovery Methods Surface Concentrations

11 Detailed Mapping and Seismography
Aquifer Location Required for Drilling Test Wells Geological and Civil Engineering Assessment Location of Additional Mineral Resources

12 Confirmation of Atmospheric Composition
Physical Properties Separation Techniques Fuel Manufacture

13 Confirmation of Regolith Composition
Mechanical Properties Physical Properties Chemical Composition Water Content

14 Confirmation of Construction Methods
“Cut and Fill” Methodology Slope Stability Fragmentation and Removal Methods Materials Testing in Mars Ambient Conditions

15 Water Well Drilling and Proving
Detailed Drilling Siesmology Operational Testing of Drill Platform Proving Water Flow Rates Recovered Water Composition Testing

16 Automated Greenhouse Setup
Supply of seeds, soils, and nutrients. Testbed for future Setup and Commissioning

17 Other Experimentation
Brick Manufacture Concrete Manufacture Metal Extraction and Refining Glassmaking Methods

18 The Mars Homestead Project
You could live here! Help us make it happen.


Download ppt "Damon Ellender, Mars Homestead Project Programming Team"

Similar presentations


Ads by Google