Presentation is loading. Please wait.

Presentation is loading. Please wait.

TTP Related SW December 4th 2007 Juha Petäjäjärvi December 4th 2007 Juha Petäjäjärvi Totem Test Platform.

Similar presentations


Presentation on theme: "TTP Related SW December 4th 2007 Juha Petäjäjärvi December 4th 2007 Juha Petäjäjärvi Totem Test Platform."— Presentation transcript:

1 TTP Related SW December 4th 2007 Juha Petäjäjärvi December 4th 2007 Juha Petäjäjärvi Totem Test Platform

2 TTP in Numbers Simple I 2 C loop with one CCU and FEC 2 I 2 C channels, data from one at the time 4 (GEM) + 1 (RP) sockets for hybrids 4 VFATs used effectively Programmable I 2 C address for one GEM 4 fifos for data 1024 x 32 bits each (85 VFAT frames) Programmable trigger pattern up to 1024 triggers, multiple trigger modes Fifo for S-bit information (256 entries)

3 Related Software Compatible with FecSoftware without any modifications I 2 C functionality Inherited lots of software from Preshower Crepe functions (trigger & data readout etc.) Use together with vfat_controller Slink readout + TBB triggering -> Crepe trigger & data readout Code optimization (I 2 C access slow via USB)

4 I 2 C Performance via USB One USB transaction, 4 ms Changing one value on VFAT requires 10-20 transactions Write & read all registers on one VFAT, 40 sec Example: Pulse scan using VCal range of 10 for 4 VFATs 150 000 transactions Theoretical minimum 10 minutes

5 Possible Performance Improvements User level USB driver -> kernel level Implemented, being tested by Wojciech (Preshower) USB 1.0 (12 Mbps) -> USB 2.0 (480 Mbps) Needs firmware modifications I 2 C bit rate 100 kbps - 1Mbps only And/or simply reduce the number of USB transactions...


Download ppt "TTP Related SW December 4th 2007 Juha Petäjäjärvi December 4th 2007 Juha Petäjäjärvi Totem Test Platform."

Similar presentations


Ads by Google