Download presentation
Presentation is loading. Please wait.
Published byNicholas Henry Modified over 8 years ago
1
Engineering Economy IEN255 Chapter 3 Leftovers Commercial Loan Transactions Amortized Loans B n = Remaining Balance at the end of period n, with B 0 = P I n = Interest payment in period n, where I n = B n-1 i P n = Principle payment in period n. So, each payment can be defined as: A = P n + I n
2
Engineering Economy Tabular Method Tabular method (spreadsheet) Interest at end of first period I 1 = B 0 i = P i Principle Payment at end of first period P 1 = A - P i Balance remaining after first payment B 1 = B 0 - P 1 = P - P 1 At the end of the second period ä I 2 = B 1 i = (P - P 1 )i ä P 2 = A - (P - P 1 )i = (A - P 1 i) + P 1 i = P 1 (1 +i) ä B 2 = B 1 - P 2 = P - (P 1 + P 2 ) ä and so on to page 146.
3
Engineering Economy Figure 3.18
4
Engineering Economy Remaining Balance Method (3.15) B n = A (P/A, i, N - n) (balance) (3.16) B n-1 i = A(P/A, i, N - n + 1) i (interest payment) (3.17) P n = A(P/A, i, N - n + 1) (principle payment) Figure 3.19
5
Engineering Economy Add on Loans Simple Interest!!! Precalculated interest and paid in equal installments Quoted is add on rate (simple) ex - 12% 2 years nominal is 21.60 %! Effective is 23.87% ! Again, to find use linear interpolation
6
Engineering Economy Variable rate mortgages mortgage - buying property monthly rates changing rate over time (rises a few years then fixes to a certain rate) or (tied to some index (T- Bills) figure3.22
7
Engineering Economy Bond Terminology Mortgage Bond - if default on bond, property backs bond Debenture Bond - simply pledge overall assets Par value - Face value (usually in even denominations (1000s)) Maturity date - Date Par value repaid Coupon Rate - Interest rate paid (annual coupon rate) Discount Bond - A bond that sells below par (face) value Premium Bond - A bond that sells above par (face) value Market Price - Value of the bond
8
Engineering Economy Figure 3.23
9
Engineering Economy Bond valuation yield to maturity - interest rate of equivalence future interest & face value receipts = market price fig 3.24
10
Engineering Economy Interpolation to find interest rate pg 159
11
Engineering Economy IEN255 Summer’99 Chapter 3 HW#2 Homework Assignment: Chapter 3 #’s 3.66; 3.73; 3.78 Due with chapter 4 homework (likely Tues June 29)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.